Laserfiche WebLink
14 <br />13 <br />12 <br />11 <br />l0 <br />«. <br />c <br />m <br />u <br />m <br />0. <br />c 9 <br />c <br />0 <br />c <br />c <br />C <br />E a <br />0 <br />,a <br />c <br />m <br />ii <br />m 7 <br />6 <br />5 <br />4 <br />SCHEDULE Al <br />0.01 0.05 01 0.5 5 10 <br />Net construction cast in millions of doilars <br />50 100 <br />FIG. 1 — CURVE A. MEDIAN COMPENSATION FOR BASIC SERVICES, <br />EXPRESSED AS A PERCENTAGE OF CONSTRUCTION COST FOR <br />PROJECTS OF ABOVE-AVERAGE COMPLEXITY. <br />ASCE Manual No. 45 <br />_22_ <br />Page 187 <br />1 1 <br />I <br />1 Net Construction 1 1 1 1 1 1 1 1 1 1 1 <br />% Fram r <br />Cast Cunt A <br />I <br />I <br />�` <br />I <br />50 ,000 13.22 <br />100,000 11.63 - <br />250,000 9.75 <br />500,000 8.52 - <br />750,000 7.90 <br />1 ,000 ,000 7.53 ,1 <br />2 ,000 ,000 6.92 <br />4 ,000 ,000 6.36 <br />6 ,000 ,000 6.20 <br />8,000,300 6.10 <br />10,000,000 6.03 <br />20 ,000 ,000 5.80 <br />I <br />0.01 0.05 01 0.5 5 10 <br />Net construction cast in millions of doilars <br />50 100 <br />FIG. 1 — CURVE A. MEDIAN COMPENSATION FOR BASIC SERVICES, <br />EXPRESSED AS A PERCENTAGE OF CONSTRUCTION COST FOR <br />PROJECTS OF ABOVE-AVERAGE COMPLEXITY. <br />ASCE Manual No. 45 <br />_22_ <br />Page 187 <br />