My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-1994 Council Agenda
>
City Council Packets
>
1990-1999
>
1994
>
10-12-1994 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2013 8:50:08 AM
Creation date
10/8/2013 8:48:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
515 Little Canada Road, Little Canada, MN 55117-1600 <br />(612) 484 -2177 / FAX: (612) 484 -4538 <br />TO: <br />MEMORANDUM <br />Mayor Hanson & Members of the City Council <br />FROM: Dave Harris, Public Works Superintendent <br />DATE: October 7, 1994 <br />RE: <br />MAYOR <br />Raymond G. Hanson <br />COUNCIL <br />Beverly Scalze <br />Jim LaValle <br />Steve Morelan <br />Bob Pedersen <br />ADMINISTRATOR <br />Joel R. Hanson <br />Installation of a Berm for Frattalone Recycling Operation <br />Several months ago, <br />installing a berm o <br />recycling operation <br />After inspection of <br />myself, we asked Mr <br />showing what he was <br />Mr. Frattalone that <br />the right -of -way to <br />Mr. Frattalone approached the City about <br />n Ryan Drive to facilitate screening of his <br />and to help keep the dust down in that area. <br />the area by the City Administrator and <br />. Frattalone to submit a plan to the City <br />proposing. It was also explained to <br />the berm would have to be back far enough off <br />facilitate snow removal and proper drainage. <br />. Frattalone has installed at his own expense <br />along Ryan Drive. This proposal was reviewed <br />City Engineer and myself. After the <br />storm sewer, Mr. Frattalone proceeded to <br />In the meantime, Mr <br />a storm sewer line <br />and approved by the <br />installation of the <br />install the berm. <br />I have recently inspected the berm and reviewed its location. I <br />believe the berm is set back far enough to facilitate snow <br />removal. At this time, I would recommend approval of the <br />installation of the berm by Frattalone Excavating on Ryan Drive <br />right -of -way contingent upon submission of a final drawing of the <br />berm showing its construction features which will be retained in <br />our records. <br />If you have any questions, feel free to contact me at your <br />earliest convenience. <br />DBH:kpv <br />cc: Frank Frattalone <br />Page 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.