My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-26-1994 Council Agenda
>
City Council Packets
>
1990-1999
>
1994
>
10-26-1994 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2013 8:55:45 AM
Creation date
10/8/2013 8:53:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT -21 -1994 10:28 FROM SIJEENEY BORER & OSTROIJ TO LITTLE CANADA P.05/09 <br />Wood Burning Furnace per unit <br />Swimming Pool Heater per unit <br />Air Exchanger with duct work per unit <br />Gas or oil spacer heater per unit <br />Gas direct vent heater per unit <br />Gas fireplace log or heater per unit <br />$25.00 <br />$25.00 <br />$20.00 <br />$20.00 <br />$20.00 <br />$20.00 <br />NOW, THEREFORE, BE IT FURTHER RESOLVED, by the City Council <br />of Little Canada that the following electrical permit fees are <br />hereby adopted, which will be effective on January 1, 1995: <br />(A) Minimum fee for each separate inspection <br />of an installation, replacement, alteration <br />or repair limited to one inspection only $22.00 <br />(B) Services, changes of service, temporary <br />services, additions, alterations, or repairs <br />on either primary or secondary services shall <br />be computed separately: <br />0 to 100 ampere capacity $25.00 <br />101 to and including 200 ampere capacity $30.00 <br />For each additional 100 ampere capacity <br />or fraction thereof $14.00 <br />(C) Circuits, installations of, additions, <br />alterations, or repairs of each circuit or <br />sub - feeder shall be computed separately, <br />including circuits fed from sub - feeders and <br />including the equipment served, except as <br />provided for in (D) through (X): <br />0 to and including 30 ampere capacity <br />31 to and including 100 ampere capacity <br />For each additional 100 ampere capacity <br />or fraction thereof <br />(D) Maximum fee an a single family dwelling shall <br />not exceed $110.00 if not over 200 ampere <br />capacity. This includes service, feeders, <br />circuits, fixtures and equipment. The maximum <br />fee provides for not more than two rough -in <br />inspections and the final inspection per <br />3 <br />Page 102 <br />$ 7.00 <br />$10.00 <br />$ 5.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.