Laserfiche WebLink
OCT -21 -1994 10:29 FROM SWEENEY BORER & OSTROW TO LITTLE CANADA P.06/09 <br />dwelling. Additional inspections are at the <br />reinspection rate. <br />(E) Maximum fee on an apartment building shall not <br />exceed $50.00 per dwelling unit for the first <br />20 units and $45.00 per dwelling unit for the <br />balance of the units. A two -unit dwelling, <br />(duplex) maximum fee per unit as per single <br />family dwelling. <br />The maximum number of 0 to 30 ampere circuits to <br />be paid on any one athletic field lighting <br />standard is ten. <br />(F) <br />(G) In addition to the above fees: <br />(1) A charge of $3.00 will be made for <br />each street lighting standard. <br />(2) A charge of $4.00.will be made for <br />each traffic signal standard. Circuits <br />originating within the standard will not <br />be used when computing fees. <br />(1!) In addition to the above fees, all transformers <br />and generators for light, heat, and power shall be <br />computed separately at $8.00 plus $.40 cents per <br />KVA up to and including 100 KVA. 101 KVA and over <br />at $.30 cents per KVA. The maximum fee for any <br />transformer or generator in this category is $80.00. <br />(I) In addition to the above fees, all transformers <br />for signs and outline lighting shall be computed <br />at $7.00 for the first 500 VA or fraction thereof <br />per unit, plus $.70 cents for each additional <br />100 VA or fraction thereof. <br />(J) In addition to the above fees, unless included in <br />the maximum fee filed by the initial installer, remote <br />control, signal circuits, and circuits of less than <br />50 volts shall be computed at $5.00 per each ten <br />openings or devices of each system plus $3.00 for each <br />additional ten or fraction thereof. <br />(K) In addition to the above fees, the inspection fee for <br />each separate inspection of a swimming pool shall be <br />computed at $25.00. Reinforcing steel for swimming <br />pools requires a rough -in inspection. <br />(L) For the review of plans and specifications of <br />proposed installations, there shall be a minimum <br />fee of $150.00 up to and including $30,000 of <br />4 <br />Page 103 <br />