My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-21-1994 Council Agenda
>
City Council Packets
>
1990-1999
>
1994
>
12-21-1994 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2014 2:41:21 PM
Creation date
10/9/2013 1:29:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mayor & City Council <br />December 16, 1994 <br />Page 2 <br />providing them with a brief description of our <br />discussion topic for that evening. The mailing list is <br />also included with this memo. <br />* Copies of photographs from the existing retaining wall <br />along Co. Rd. C in Maplewood. <br />Based on this information, the Public Works Superintendent and I <br />would recommend the City proceed with the removal of the existing <br />walls and installation of a one -to -one slope within the City's <br />right -of -way. We favor this option as it provides the following <br />advantages: <br />* Less construction costs to the City for installation. <br />* Aesthetics are perceived to be superior in that chain <br />link fence would be necessary due to the height of the <br />wall if that option were pursued. <br />* On -going City maintenance should be less in that <br />plantings should be maintenance free. If the retaining <br />wall option were proposed, some maintenance activities <br />may be necessary on the terraced areas depending on the <br />plantings utilized. We do recognize that some slope <br />maintenance may be necessary in cases of severe erosion <br />although we feel they may be minimal given the County's <br />experience on Co. Rd. B2 and assuming initial plantings <br />take root properly. <br />At Wednesday's meeting, input from the neighborhood should be <br />taken as to their preference for the improvement. Angela <br />Popenhagen will be present to answer questions based on her <br />review. Please keep in mind that we have not conducted a full <br />blown design analysis. Rather, we have attempted to generate <br />sufficient information to assist you in making a decision. The <br />Council then needs to direct us as to the course of action <br />preferred. <br />Should you have any comments or questions in the meantime, please <br />let me know. <br />JRH:kpv <br />Enclosures <br />cc: Jerry Bourdon, City Engineer <br />Bill Sanders, Park Consultant <br />Jack Desai <br />Page 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.