My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-1994 Council Agenda
>
City Council Packets
>
1990-1999
>
1994
>
06-22-1994 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2013 2:59:35 PM
Creation date
10/9/2013 2:57:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />Project Status: Council has authorized the project and set a bid date of July 5. Council <br />direction is to bid the street improvement with an alternate for walks / trails. The purpose <br />of the June 22 neighborhood meeting is to decide upon the scope and nature of the trail <br />/ walk improvements so the final plans can be completed and released to the bidders in time <br />to open the bids as scheduled. <br />Scope of trail / walk improvements: Council and staff have discussed various other <br />alternatives to improve pedestrian transportation than are suggested herein, including: <br />wider streets with laneways for pedestrians, alternative locations (opposite sides of the street <br />and differing routes), no boulevard (walk abutting curb) etc. The route alignment and trail <br />location suggested herein is not intended to limit the discussion of other options. However <br />the information herein represents what in staff's opinion is one of the most viable options <br />available and is offered as a starting point for discussion. <br />Cost Estimates: Because the scope of the proposed work is not yet well defined we have <br />not completed exacting and detailed cost estimates. However we have prepared rough cost <br />estimates that we believe are adequate for comparison of alternatives. These cost estimates <br />were presented previously to Council on May 25 and are presented below for reference. <br />COST ESTIMATE <br />Segment 1: <br />Segment 2: <br />Segment 3: <br />8' bituminous trail <br />5' concrete walk <br />6' concrete walk <br />$ 40,000 <br />43,230 <br />49,240 <br />8' bituminous trail $ 34,200 <br />5' concrete walk 39,140 <br />6' concrete walk 42,275 <br />8' bituminous trail $ 5,150 <br />5' concrete walk 5,345 <br />6' concrete walk 6,040 <br />Bonestroo, Rosene, Anderlik & Assoc., Inc. <br />Page 47 3 <br />