My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2013 Council Agenda
>
City Council Packets
>
2010-2019
>
2013
>
12-18-2013 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2013 8:58:28 AM
Creation date
12/17/2013 8:43:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE TOTAL PRICE <br />10 <br />2104.523 <br />SALVAGE MAILBOX <br />EACH <br />8.00 <br />5250.00 <br />$2,000.00 <br />11 <br />2105.501 <br />COMMON EXCAVATION (P) <br />CY <br />1572.74 <br />$9.23 <br />$14,516.40 <br />12 <br />2105.501 <br />POND EXCAVATION (RAINWATER GARDEN) <br />CY <br />150.00 <br />58.43 <br />$1,264.50 <br />13 <br />2105.525 <br />TOPSOIL BORROW <br />CY <br />240.74 <br />$19.53 <br />$4,701.67 <br />14 <br />2131.502 <br />CALCIUM CHLORIDE <br />GAL <br />2500.00 <br />$1.24 <br />$3 100.00 <br />15 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />1490.00 <br />$10.36 <br />$15,436.40 <br />16 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />60.00 <br />$7.71 <br />5462.60 <br />17 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />150.00 <br />567.90 <br />$10,185.00 <br />18 <br />2350.501 <br />TYPE MV4 WEAR COURSE MIXTURE LDRIVEWAY) <br />TON <br />70.00 <br />5102.47 <br />57,172.90 <br />19 <br />2350.502 <br />TYPE LV3 NON WEARING COURSE MIXTURE (BASE) <br />TON <br />200.00 <br />565.74 <br />513,148.00 <br />20 <br />2503.541 <br />12" RC PIPE SEWER DES 3006, CLV <br />LF <br />60.00 <br />526.32 <br />$1,579.20 <br />21 <br />2503.541 <br />15" RC PIPE SEWER DES 3006, CLV <br />LE <br />140.00 <br />$27.57 <br />$3,859.80 <br />22 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />2.00 <br />51 329.90 <br />$2,659.80 <br />23 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24 "X36" <br />EACH <br />2.00 <br />$1,459.82 <br />52,919.64 <br />24 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN 484020 <br />EACH <br />2.00 <br />$2,015.65 <br />54,031.30 <br />25 <br />2506.522 <br />ADJUST FRAME AND RING CASTING <br />EACH <br />7.00 <br />5399.60 <br />52,797.20 <br />26 <br />2506.602 <br />CONST SANITARY MANHOLE 0' -8' <br />EACH <br />1.00 <br />55,000.00 <br />$5,000.00 <br />27 <br />2531.501. <br />CONCRETE CURB & GUTTER DESIGN 6618 <br />LE <br />1300.00 <br />$9.52 <br />$12,376.00 <br />28 <br />2531.507 <br />CONCRETE DRIVEWAY APRON (6" THICK) <br />SY <br />110.00 <br />$47.49 <br />$5,223,90. <br />29 <br />2531.507 <br />CONCRETE DRIVEWAY PAVEMENT (6" THICK) <br />SY <br />360.00 <br />$47.49 <br />517,096.40 <br />30 <br />2540.602 <br />INSTALL SALVAGED MAILBOX <br />EACH <br />8.00 <br />$120.00 <br />5960.00 <br />31 <br />2540.603 <br />LANDSCAPE EDGER, STEEL <br />LF <br />300.00 <br />$4.22 <br />$1,266.00 <br />32 <br />2540.618 <br />INSTALL RETAINING WALL <br />SF <br />0.00 <br />527.00 <br />50.00 <br />33 <br />2557.603 <br />INSTALL FENCE <br />LF <br />0.00 <br />$40.00 <br />50.00 <br />34 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />$2,165.00 <br />52,165.00 <br />35 <br />2564.602 <br />INSTALL SALVAGED SIGN <br />EACH <br />4.00 <br />$100.00 <br />5400.00 <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LF <br />640.00 <br />$2.50 <br />$1,600.00 <br />2573.520 <br />SEDIMENT REMOVAL BACKHOE <br />HOURS <br />5.00 <br />$238.00 <br />$1,190.00 <br />2573.530 <br />INLET PROTECTION (VVIMCO) <br />EACH <br />6.00 <br />5256.00 <br />51,536.00 <br />2573.530 <br />INLET PROTECTION STRUCTURE W/O CASTING <br />EACH <br />5.00 <br />$194.60 <br />$973.00 <br />2573.602 <br />INLET SEDIMENT REMOVAL <br />EACH <br />11.00 <br />5120.00 <br />$1,320.00 <br />2573.602 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />1.00 <br />51,310.00 <br />$1,310.00 <br />2573.607 <br />ROADWAY ROCK CHECK DAM <br />CY <br />50.00 <br />545.00 <br />$2,250.00 <br />43 <br />2575.505 <br />SOD <br />SY <br />2168.67 <br />$4.25 <br />59,208.33 <br />44 <br />2575.513 <br />MULCH MATERIAL TYPE SPECIAL <br />CY <br />25.00 <br />535.00 <br />5875.00 <br />45 <br />2575.550 <br />COMPOST GRADE 2 <br />CY <br />25.00 <br />532.00 <br />5800.00 <br />46 <br />SPEC <br />IRRIGATION REPAIR <br />LOT <br />2.00 <br />5500.00 <br />51,000.00 <br />47 <br />SPEC <br />LANDSCAPE REPAIR <br />LS <br />1.00 <br />5500.00 <br />$500.00 <br />SCHEDULE 3.0 - AUSTRALIAN AVENUE STREET -- TOTAL <br />10% Contingency <br />Construction Subtotal <br />25% Engineering & Overhead <br />AUSTRALIAN AVENUE STREET TOTAL <br />$185,455.95 <br />518.545,59 <br />5204,001.54 <br />551 000.39 <br />$265,001.93 <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.