My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2013 Council Agenda
>
City Council Packets
>
2010-2019
>
2013
>
12-18-2013 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2013 8:58:28 AM
Creation date
12/17/2013 8:43:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM <br />NO. <br />'ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE TOTAL PRICE <br />SCHEDULE 4.0.. AUSTRALIAN WATERMAIN <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />$1,800.00 <br />$1,800.00 <br />2 <br />2504602 <br />8" X 8" WET TAP <br />EACH <br />1.00 <br />$5,000.00 <br />55,000.00 <br />3 <br />2504.602 <br />INSTALL HYDRANT AND VALVE <br />EACH <br />2.00 <br />54,590.26 <br />59.180.52 <br />4 <br />2504.602 <br />1" WATER SERVICE CONNECTION <br />EACH <br />6.00 <br />$371.87 <br />52,231.22 <br />5 <br />2504.603 <br />1 " TYPE K COPPER PIPE <br />LF <br />180.00 <br />$17.13 <br />53 083.40 <br />6 <br />2504.603 <br />6" DUCTILE IRON WATERMAIN CL52 <br />LF <br />60.00 <br />532.84 <br />$1,970.40 <br />7 <br />2504.603 <br />8" DUCTILE IRON WATERMAIN CL52 <br />LF <br />575.00 <br />$35.86 <br />$20,619.50 <br />8 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />LB <br />248.00 <br />$7.64 <br />51,894.72 <br />SCHEDULE 4.0 - AUSTRALIAN WATERMAIN .- TOTAL $45,779.76 <br />10% Contingency <br />$4 577.98 <br />Construction Subtotal <br />550,357.74 <br />25% Engineering & Overhead <br />512,589.43 <br />AUSTRALIAN AVENUE WATERMAIN TOTAL <br />562,947.17 <br />TOTAL COSTS PER STREET & WATERMAIN SECTION <br />SCHLETTY DRIVE STREET TOTAL <br />SCHLETTY DRIVE WATERMAIN TOTAL <br />AUSTRALIAN AVENUE STREET TOTAL <br />AUSTRALIAN AVENUE WATERMAIN TOTAL <br />TOTAL PROJECT COST <br />TOTAL PROJECT COSTS <br />TOTAL CONSTRUCTION COST <br />10% CONTINGENCY <br />25% ENGINEERING & OVERHEAD <br />TOTAL PROJECT COST <br />21 <br />$408,022.80 <br />5115,038.71 <br />5255,001.93 <br />$62,947.17 <br />5641,008.61 <br />$611,642.62 <br />561,164.26 <br />$168,201.72 <br />5641,008.81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.