My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETAILED WORK PLAN- continued <br />In summary, the Design Development phase will provide additional evaluation, <br />further detail, further development, and expand upon all of the services <br />provided in the Pre - design and Schematic design phases (as outlined earlier). <br />Design Development deliverables will include the following: <br />• Summary of security, networking, and telecommunications with <br />Little Canada (as required) <br />• Summary of sustainability goals and project objectives with Little <br />Canada <br />• Developed detailed designs for building and site <br />• Computer generated models of final building design <br />• Plans for all systems, including mechanical, electrical, plumbing, and <br />maintenance equipment <br />• Update of estimated costs based on final design (with C.M.) <br />• Updated project work plan (with C.M.) <br />• Updated estimated project schedule (with C.M.) <br />• Updated systems analysis, report, and recommendations <br />• Updated maintenance equipment analysis and summary report <br />• Updated space program (if any changes are made) <br />• Completion of Design Development package <br />To begin the Construction Document phase, we will incorporate the City's <br />feedback and proposed modifications from Design Development review, in <br />order to proceed with design. Our team will continue by producing all of the <br />drawings and specifications to form the basis of the project's Construction <br />Documents. Additionally, we will revise the review of constructability, <br />including mitigation plans for any long -lead items (many maintenance <br />equipment and servicing items have a long -lead time), maintenance equipment <br />traffic and access, safety, and construction staging. We will also create a City <br />project communication plan to clarify the City's final approval procedures and <br />required documents. <br />The Construction Document phase will involve preparing updated construction <br />documents including the final building designs, site plan, landscape plans, <br />architectural plans, sections, elevations, details, schedules, structural drawings, <br />mechanical, electrical, and plumbing drawings, incorporation of all <br />sustainability components, City personnel coordination, details and <br />construction specifications. <br />We will continue to coordinate with the entire Planning Project Team <br />throughout the entire process to ensure that we provide for the best interest <br />of the City, and provide the project on schedule and within budget. <br />38 <br />10 <br />�aunU�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.