My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120:'1 -1 ITE=;C1'` <br />2013 <br />CARVER <br />•`..(.OLIN 11' <br />2013 <br />City of Eaton <br />2013 <br />ty <br />2013 <br />Carver County Public Works Study <br />Description: The County currently operates out of 4 facilities. This study is to <br />determine if redundancies exist, evaluating existing public works shops, <br />functions, and locations and recommend a long range strategy an how to best <br />deploy highway resources. (Study is currently underway.) <br />Contact: Nick Koktavy, Carver County Project & Communications Manager <br />e: nkoktavy @co.carver.mn.us <br />p: (952) 361 -1797 <br />Consultants: Not applicable <br />City of Eagan Public Works Phase I & 11 Planning <br />Description: Provide planning and analysis of maintenance facility space needs <br />and current space available providing multiple schematic design options. <br />(Phase I planning took place in 2012). <br />Contact: Paul Olson, Superintendent of Parks <br />e: polson @cityofeagan.com <br />p: (651) 675 -5313 <br />Consultants: Not applicable <br />Cook County Public Works Study <br />Description: This planning study involved a number of tasks and planning <br />exercises. Over the course of a year and a half, this included the following: <br />Assessment of existing conditions of the main site and satellite sites, Meetings <br />with staff to determine short and long term needs and goals, Preparation of a <br />space needs program for planning, Meetings with staff and selected <br />commissioners to review findings, Preparation of soil borings, soil <br />recommendations and depth to bedrock, Preparation and development of <br />several planning options, Preparation of cost estimates for planning options, <br />and Preparation of a summary of existing conditions and final report. <br />Contact: David Betts, Cook County Highway Engineer <br />e: david.betts @co.cook.mn.us <br />p: (218) 387 -3695 <br />Consultants: Not applicable <br />St. Louis County Public Works Study <br />Description: The integrated study Included the review and analysis of the <br />following: Main service centers and satellite shops, current and potential <br />energy costs, existing versus ideal shop locations and plow routes, fleet <br />operations and turnover of vehicles, fueling systems, salt and brine storage, <br />operational and facilities space needs and equipment requirements, planning <br />and schematic design of a new main service center, budgeting and cost <br />estimating for future County funding, and recommendations on long term <br />plans and operational needs. <br />Contact: Peter Eakman, St. Louis County Maintenance Engineer <br />e: eakmanp @stlouiscountymn.gov <br />46 <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.