My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RTEL <br />" RC HITI C FS <br />p: (218) 625 -3805 <br />Consultants: Not applicable <br />2013 MnDOT Plymouth Truck Station Building <br />Description: The new Truck Station facility is a 38,500 square foot addition to <br />the existing 24,000 square foot facility. The new facility contains vehicle <br />storage, offices, crew facilities, Inventory center, and truck wash space. <br />Contact: David Jones, Architect, MnDOT Building Services <br />e: david.r.jones @state.mn.us <br />p: (651) 366 -3365 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />2013 MnDOT Maplewood Bridge Crew Building <br />Description: The new 18,700 square foot building contains vehicle storage for <br />15 vehicles, welding and carpenter shops, and crew support spaces for 8 -12 <br />bridge workers. <br />Contact: David Jones, Architect, MnDOT Building Services <br />e: david.r.jones @state.mn.us <br />p: (651) 366-3365 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />2013 Andrew's Park- splash pad, restroom building & sheltered picnic areas <br />Description: This project added two new structures to a large and heavily <br />used existing park in the City of Champlin. The new structures include <br />restrooms, meeting spaces and sheltered outdoor areas that will serve as a <br />new splash pad and existing playground at one of the parks' three activity <br />hubs. <br />Contact: Dan Masloski, Parks Facilities Manager <br />e: recreation @ci.champlin.mn.us <br />p: (763)421 -2820 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />iy i <br />hamplin <br />2013 Kaiser Pool House Building- Wausau Wisconsin <br />Description: We are working as a consultant to the Civil Engineer/ Pool <br />Consultant. The project includes designing multiple options for a new pool <br />house/ concession stand/ changing facility for the Kaiser outdoor pool located <br />in Wausau, WI. Ultimately the City will select an option and we will proceed <br />with construction documents. <br />Contact: Mr. Jody Dahms, President of Aquatic Design Solutions, LLC <br />e: Jody. dahms @aquaticdesignsolutionslic.com <br />p: (952) 356 -6047 <br />Consultants: Not applicable, we are not project lead <br />47 <br />19 <br />cry'cptinuic r <br />
The URL can be used to link to this page
Your browser does not support the video tag.