My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RCHFT'ECTS <br />2011 City of Minnetonka City Hall Window Assessment <br />Description: Assessing and preparing bid documents for the replacement of <br />the existing windows at City Hall. <br />C'`rY >`ff Contact: Brian Wagstrom, Public Works Director <br />rill nitet��I� Ca ;' e: bwagstrom@eminnetonka.com <br />p: (952) 988 -8403 <br />Consultants: Not applicable <br />Cityof Maple Glove <br />2010 City of Maple Grove Public Works Facility <br />Description: A 140,000 square foot expansion with a complete renovation of <br />the existing 58,000 square foot building. <br />Contact: Ken Ashfeld, Public Works Director <br />e: kashfeld @maplegrovemn.gov <br />p: (763) 494 -6351 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />2010 City of White Bear take Public Works Facility <br />Description: New 60,000 square foot public works facility with 2 level office <br />area and mezzanine storage. A new salt/ sand building was also built. <br />Contact: Mark Burch, Public Works Director <br />e: mburch @whitebearlake.org <br />p: (651) 429 -8531 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />2010 City of Edina Public Works Facility (Adaptive reuse of ConAgra Foods Building) <br />Description: Basically, we took an existing popcorn factory (Pop Secret) and <br />turned it Into a 138,000 square foot public works facility. <br />Contact: Wayne Houle, Director of Engineering <br />e: whoule @ci.edina.mn.us <br />p: (952) 826 -0443 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />2010 City of Vadnais Heights North Service Center <br />Description: The project includes the design of 78,100 square foot joint facility <br />consisting of public works, a fire station and community area spaces. The City has <br />been renting out the community area spaces for private events such as weddings& <br />conferences- turning the facility into an Income generator for the City. <br />Contact: Mark Graham, Public Works Director <br />e: mark .graham @cityvadnaisheights.com <br />p: (651) 204-6150 <br />Consultants: Electrical Engineer- Dan Paulson, Paulson & Clark Engineering <br />Mechanical Engineer- Rob Lowe, Paulson & Clark Engineering <br />53 <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.