Laserfiche WebLink
CITY OF BLAINE <br />PUBLIC WORKS EXPANSION <br />Contact: Mike Ulrich <br />Public Works Director <br />1801101" Avenue NE <br />Blaine, MN55449 <br />(763) 785-6165 <br />mulrich@clblainemn.us <br />New public works facility and <br />renovation of the existing facility <br />• 94,580 sq. ft. new <br />35,520 sq. ft. <br />renovated existing <br />• Completion in August of 2009 <br />• Construction cost $10,203,400 <br />TEAM MEMBERS WHO WORKED <br />ON THIS PROJECT WHO ARE ALSO <br />ASSIGNED TO YOUR PROJECT: <br />Jeff Oertel, Project Manager <br />Brenda Dever, Interior Design <br />Dan Paulson, Electrical Engineer <br />Rob Lowe, Mechanical Engineer <br />The new multi -level facility provides the city with approximately 129,900 square <br />feet of space and consists of 33,730 square feet of maintenance/ mezzanine <br />space and shops, 18,828 of office space, and 76,025 square feet of vehicle storage <br />space (35,520 of which was existing space which was renovated). The facility <br />remained in operation throughout the construction and renovation phases. To <br />keep disruptions of the operations at a minimum, careful attention was paid to <br />the potential construction sequencing of the facility starting with the initial <br />schematic design. Maintaining vehicular access to the facility is key for public <br />works operations. <br />Below: The locations in blue represent the areas that were expanded. <br />Existing renovated <br />. building shown in white <br />63 <br />