My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-06-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
01-06-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2014 6:38:56 PM
Creation date
1/6/2014 6:32:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF OTSEGO CITY HALL & <br />PUBLIC WORKS <br />Contact: Brad Belair <br />Public Works Supervisor <br />p. 763.235 -3175 <br />e. belairb@ci.otsego.mn.us <br />New public works facility <br />• 32,750 square feet <br />• Completion in January of 2007 <br />• Construction cost $3,947,344 <br />This project includes the design and <br />construction of a new 32,750 square <br />foot public works facility. There is <br />18,300 square feet of vehicle storage <br />space, 2,300 sq. ft. vehicle <br />maintenance bay, a 1,200 sq. ft. <br />welding bay, a 700 sq. ft. tool crib, <br />1,650 sq. ft. wash bay, a sign shop <br />and 4,300 sq. ft. of office space, <br />which includes employee locker <br />rooms and a multipurpose room. The <br />second floor is currently unoccupied <br />and has an additional 4,300 sq. ft. of <br />office space. City Hall relocated their <br />offices to the second floor of this <br />facility in 2012. <br />The City toured a number of Oertel <br />Architects' other public works <br />facilities. The one feature that stood <br />apart in all of these facilities was the <br />emphasis on natural light, especially <br />in the shop, maintenance and vehicle <br />storage areas, areas which have been <br />largely neglected in years past. <br />Incorporating this aspect was one of <br />the driving forces for the final design <br />of the facility. <br />TEAM MEMBERS WHO WORKED ON THIS <br />PROJECT WHO ARE At50 ASSIGNED TO YOUR <br />PROJECT: <br />Jeff Oertel, Project Manager <br />Thomas Stromsodt, Architect <br />Brenda Dever, Interior Design <br />Dan Paulson, Electrical Engineer <br />Rob Lowe, Mechanical Engineer <br />Dennis Goodno, Structural Engineer <br />64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.