Frattalone Sewer Extension City of Little Canada <br />COST /REVENUE SUMMARY <br />Costs <br />The estimated costs for the work presented in this report have been itemized in the <br />appendices at the back of this report. The cost estimates include construction, contingency <br />items, design, inspection, administration, and capitalized interest costs. <br />Soil borings have not yet been completed in this specific area. The costs presented herein <br />could change subsequent to the completion of soils exploration work. <br />Project costs are summarized as follows: <br />IMPROVEMENT <br />LATERAL <br />COST <br />SERVICE <br />COST <br />TOTAL <br />COST <br />Option 1 - Gravity on pilings <br />$110,600 <br />$27,500 <br />$138,100 <br />Option 2A - Force main to Levitz line <br />$28,400 <br />$12,100 <br />$40,500 <br />Option 2B - Force main to MCWS MIH <br />$27,300 <br />$9,500 <br />$36,800 <br />Option 3 - Force main to Levitz line <br />serving all properties <br />$94,900 <br />$10,900 <br />$105,800 <br />The "lateral costs" outlined above are for proposed City owned facilities. "Service costs" are <br />associated with the Frattalone service line. <br />Although Option 2A costs slightly more than Option 2B, it completes more of the ultimate <br />system serving the eastern half of the industrial park. It would cost Option 2B an additional <br />$25,000 to $35,000 to bring it to the same ending location as Option 2A. <br />Note that Option 3 is an extension of Option 2A. It provides all of the benefitting <br />properties with immediately available City sanitary sewer. <br />37225.rpt <br />Page 11 <br />6 <br />