Laserfiche WebLink
SUBSTANTIAL COMPLETION DATE <br />ORIGINAL: <br />REVISED: <br />PARTIAL PAY ESTIMATE #5 <br />FROM: December 10.2013 <br />TO: February 14, 2014 <br />CONTRACTOR: FPI PAVING CONTRACTORS, INC. <br />ADDRESS: 3230 RICE STREET, LITTLE CANADA, MN 55117 <br />OWNER: CITY OF LITTLE CANADA <br />PROJECT: LITTLE CANADA ROAD IMPROVMENTS <br />AMOUNT OF CONTRACT <br />ORIGINAL: $ 1,030,026.31 <br />REVISED: <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />011,60UL6 44 - LITTLE PANADA ROAD <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />55000.00 <br />0.00 <br />$0.00 <br />1.00 <br />555,000.00 <br />2 <br />2101.501 <br />CLEARING <br />ACRE <br />0.12 <br />6,500.00 <br />0.00 <br />$0.00 <br />0.17 <br />81,105.00 <br />3 <br />2101.502 <br />CLEAR <br />TREE <br />8.00 <br />350.00 <br />4.00 <br />51,400.00 <br />12.00 <br />$4.200.00 <br />4 <br />2101.506 <br />GRUBBING <br />ACRE <br />0.12 <br />6.500.00 <br />0.00 <br />80.00 <br />0.17 <br />0,105.00 <br />5 <br />2101.507 <br />GRUB <br />TREE <br />LF <br />8.00 <br />45.00 <br />250.00 <br />16.80 <br />4.00 <br />0.00 <br />$11,000.00 <br />$0.00 <br />13.00 <br />58.00 <br />53,250.00 <br />$974.40 <br />6 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />7 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LF <br />940.00 <br />6.40 <br />0.00 <br />$0.00 <br />786.00 <br />$5B30.40 <br />8 <br />2104.501 <br />REMOVE FENCE <br />LF <br />10.00 <br />5.00 <br />0.00 <br />$0.00 <br />160.00 <br />$800.00 <br />9 <br />2104.501 <br />REMOVE GUARD RAIL <br />LF <br />•' <br />10 <br />2104.503 <br />REMOVE RETAINING WALL <br />SF <br />0.0 <br />0.00 <br />$0.00 <br />84.00 <br />„:0 <br />2104.503 <br />REMOVE LANDSCAPING <br />0000 <br />0.00 <br />.•:: <br />00.0 <br />$1.815.00 <br />2104.505 <br />REMOVE CONCRETE PAVEMENT <br />:00 <br />00 <br />414.00 <br />:•• <br />9':14 <br />00 <br />56,664.00 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />••••• <br />•• <br />148.00 <br />99 <br />$9,500,00 <br />2104.509 <br />REMOVE POLE BASE <br />® <br />00 <br />.0• 0 <br />0.00 <br />':•: <br />00 <br />$1.00000 <br />2104.509 <br />REMOVE FLAG POLE <br />00 <br />.0 . • <br />0.00 <br />so .00 <br />00 <br />81.000,00 <br />2104.509 <br />2109.509 <br />REMOVE HYDRANT <br />REMOVE DRAINAGE STRUCTURE <br />EACH <br />0. <br />4.00 <br />1,890.00 <br />0.00 <br />$0.00 <br />2.00 <br />$3,780.00 <br />505.00 <br />0.00 <br />$0.00 <br />4.00 <br />$2,020,00 <br />: <br />2104.509 <br />REMOVE VALVE <br />EACH <br />1.00 <br />1.765.00 <br />0.00 <br />$000 <br />1.00 <br />$1765.00 <br />2104.511 <br />SAW CUT CONCRETE (FULL DEPTH) <br />LF <br />100.00 <br />2.65 <br />0.00 <br />$0.0 0 <br />8600 <br />8492.90 <br />: <br />2104.513 <br />SAW CUT BITUMINOUS (FULL DEPTH) <br />LE <br />850.00 <br />2.35 <br />0.00 <br />$0.0 • <br />00 <br />$,553,35 <br />2104.523 <br />SALVAGE SIGN <br />EACH <br />33.00 <br />26.00 <br />0.00 <br />$0.0 0 <br />•0 <br />$858.00 <br />8,000.00 <br />®leani <br />2104.618 <br />SALVAGE BANNER POLE <br />11111=1111111111121111111 <br />500.00 <br />0.00 <br />$0.0 • <br />00 <br />SALVAGE PAVERS <br />SF <br />905.00 <br />5,00 <br />0.00 <br />$0.0 0 <br />1013,00 <br />$5,065.00 <br />2104.523 <br />SALVAGE MAlL80% <br />EACH <br />14.00 <br />36.75 <br />$0.00 <br />10,00 <br />8367.50 <br />2105.501 <br />COMMONEXCAVATION(P) <br />CY <br />2,130.00 <br />23.00 <br />$0.00 <br />2130,00 <br />$48.990.' <br />- <br />2105.501 <br />POND EXCAVATION (RAINWATER GARDENS)IP) <br />CY <br />345.00 <br />30.00 <br />00• <br />.000 <br />345.0 <br />$10,350, <br />27 <br />2105.525 <br />TOP SOIL BORROW (CV) <br />00 <br />4000 <br />8000 <br />$21,580.00 <br />: <br />• •. <br />SUBGRADE CORRECTION <br />• 0• <br />00 <br />• 00 <br />0 0• <br />520,296.35 <br />• <br />. <br />SUBGRADE PREPARATION <br />• <br />0 00 <br />• 0: <br />: 0• <br />$6,000.00 <br />• <br />•0 <br />CALCIUM CHLORIDE SOLUTION <br />.00 <br />000 <br />265.00 <br />I <br />00 <br />12 0 <br />20.00 <br />•• <br />:0 <br />0.00 <br />'.00• <br />$1,300.00 <br />.0 0 <br />17 es <br />00 <br />00 00 <br />50.00 <br />MIIIIIIINEED <br />0:00 <br />' • . •. <br />® <br />• <br />AGGREGATE BASE _CLASS$ <br />PLACE ( <br />• <br />CY <br />65.00 <br />• •: <br />BASE PLACED <br />•MILL <br />BITUMINOUS PAVEMENT <br />$0 <br />• 00 <br />: 00 <br />JAGGREGATE <br />RECLAIM BITUMINOUS PAVEMENT <br />0 <br />00 <br />0 0000 <br />•0 <br />TYPE SPWE834OE WEARING COURSE MIXTURE <br />• <br />00 <br />00 <br />000 <br />',•00 <br />0 <br />TYPE SPWEB340C WEARING COURSE MIXT <br />TON <br />2.155.00 <br />75.0 0 <br />00. <br />$0.00 <br />0 •0 <br />$90,142.50 <br />2350.501 <br />TYPE SPWEB34C WEAR NG COURSE MIX ( DRIVEWAY) <br />TON <br />550.00 <br />100.0 0 <br />$800.00 <br />520.91 <br />$52.091.00 <br />39 <br />2411.618 <br />BLOCKRETAINING WALL SPECIAL (WET CAST) <br />SF <br />1.900,00 <br />36.00 <br />000 <br />Ti <br />$0.00 <br />1975.13 <br />$71,104.68 <br />40 <br />2501 602 <br />12`RC FLARED END SECTION W /TRA SHGUARD <br />00 <br />1 250 00 <br />0•0 <br />0 0• <br />1.00 <br />$1,250.0 <br />.• Iil SN <br />00 •.• <br />0.0 <br />-00 <br />: 0. <br />• <br />0,00 <br />$000 <br />0 0• <br />00 <br />0• <br />0.00 <br />'•0• <br />0: <br />0 •0 <br />•• <br />0.00 <br />• •• <br />0• <br />• 0. <br />.. <br />0.00 <br />.. 00 <br />• • <br />:06 <br />0.00 <br />.00 <br />.0 <br />• <br />•0 <br />0 <br />0,00 <br />: • <br />Fil' <br />•• <br />0 <br />0• <br />0.00 <br />: <br />•0 <br />•0 <br />0.00 <br />80.00 <br />•: <br />. •• <br />0.00 <br />$D.6D <br />0.00 <br />$0.00 <br />0 <br />•8000 <br />0.00 <br />50.00 <br />• <br />• • <br />0• <br />0• <br />0.00 <br />80.00 <br />0• <br />OFFSET <br />EACH <br />1 00 <br />4 145.00 <br />0,00 <br />80.00 <br />0 <br />:460 <br />INSTALL HYDRANT AND VALVE <br />EACH <br />2.00 <br />6,225.00 <br />000 <br />$000 <br />2.00 <br />$12.450.00 <br />• <br />® <br />2504 602 ADJUST VALVE <br />2504.602 WM FITTING BOLT REPLACEMENT <br />EACH <br />EACH <br />2.00 <br />1.00 <br />350.00 <br />1,230.00 <br />• •0 <br />000 <br />.0 00 <br />.000 <br />• 00 <br />000 <br />0 00 <br />$000 <br />EACH <br />1.00 <br />3.940.00 <br />0.00 <br />0 <br />1,00 <br />• • 0 <br />1 1/2" TYPE IC COPPER PIPE <br />LF <br />55.00 <br />46.00 <br />0.00 <br />.0 •0 <br />41,00 <br />CONST DRAINAGE STRUCTURE DE$IGN SPEC 24 "X36" <br />EACH <br />1.00 <br />1,490.00 <br />0.00 <br />' • 00 <br />2.00 <br />0 <br />CONST DRAINAGE STRUCTURE DESIGN 484020 <br />EACH <br />18.00 <br />2,235.00 <br />0.00 <br />'.000 <br />16.00 <br />0ADJUST <br />R[6,'GATEVALVEANDEOX <br />FRAME RING AND CASTING <br />EACH <br />18.00 <br />550.00 <br />9.00 <br />• 0 00 <br />ORUCT SANITARY MANHOLE <br />EACH <br />1.00 <br />1,605.00 <br />0.00 <br />•00 <br />1.00 <br />00 <br />RANDOM RIP RAP, CLASS IV <br />CY <br />10.00 <br />110.00 <br />0.00 <br />• 00 <br />0.00 <br />mimum4" <br />GRANULAR BEDDING SPECIAL (CV) (P) <br />CONCRETE SIDEWALK <br />CY <br />125.00 <br />50.00 <br />0.00 <br />$0.00 <br />0.00 <br />.000 <br />15,500.00 <br />2.90 <br />1053. OC <br />053.70 <br />12328.00 <br />2 <br />