My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-2014 Council Agenda
>
City Council Packets
>
2010-2019
>
2014
>
05-28-2014 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2014 3:52:21 PM
Creation date
5/22/2014 3:49:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t1ftt1NG -ASSO(U1TC <br />Mit NOM <br />Memo <br />TO: Honorable Mayor and City Council <br />FROM: Lee Elfering, City Engineer <br />DATE: May 22, 2014 <br />RE: Little Canada Road Improvements Project <br />Supplemental Agreement #1 <br />As the Council is aware the City and Ramsey County developed a joint project for the <br />improvement of Little Canada Road from the 35E Bridge to Edgerton Street that began <br />last year. The original scoping of the plan included the installation of sidewalk on the <br />south side of Little Canada Road along the entire project length; however the sidewalk <br />from just west of the Church to the Interstate Bridge was eliminated because easements <br />were necessary and they could not be obtained in time for inclusion of this sidewalk in <br />the original plan. Since that time the City has been working on acquiring all the <br />necessary easements along this section of the roadway and recently obtained the last <br />easement area. <br />The original completion of the Little Canada Road project was anticipated in 2013, <br />however due primarily to delays of required power pole relocations all work was not <br />completed and the Contractor is again working on the project this year. Both Ramsey <br />County and City staff believe that it would be beneficial to have the Contractor complete <br />the remainder of the sidewalk that was originally proposed while they are working to <br />complete the remainder of the project. <br />Attached to this memo is Supplemental Agreement #1 which would add the installation <br />of the sidewalk from the Church property to the Interstate Bridge into the current Little <br />Canada Road contract with FPI. The summary of cost sheet outlines the proposed cost <br />sharing of the construction costs with Ramsey County, and we are awaiting their <br />approval of these percentages. At this time we would recommend that the City Council <br />authorize approval of Supplemental Agreement #1, in the amount of $76,076.80 and <br />have the work completed under this existing contract. We will continue to work with the <br />County on finalizing the cost split, but authorization now will allow the Contractor to <br />schedule the work so it does not delay completion of the project longer than necessary. <br />If you have any questions or concerns please feel free to call me at (763) 780-0450 <br />extension 3. <br />10062 Flanders Court NE — Blaine, MN 55449 — Ph: (763) 780-0450 Fax (763) 780-0452 <br />Z:\PROJ1120156E - LC Road (Bridge to Edgerton)\0077\Change Orders\Memo-052214-CC (Supplemental Agreement N1).doc <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.