Laserfiche WebLink
tlTtRli16 ASSOCI-ATES <br />Memo <br />TO: Honorable Mayor and City Council <br />FROM: Lee Elfering, City Engineer <br />DATE: July 2, 2014 <br />RE: Little Canada Road Improvements Project <br />Supplemental Agreement #2 <br />Ramsey County has been reviewing the possibility of adding designated left turn lanes <br />on the Little Canada Road Bridge to improve traffic flow in the area. The result of their <br />review was that with some minor signal modifications and restriping the turn lanes could <br />be added at a relatively low cost which makes the project very cost effective. The <br />existing Little Canada Road project includes milling and overlaying the bituminous <br />surface up to the bridge deck and some of the work for the signal modifications and <br />restriping will overlap into our existing project area. Therefore, the County has <br />requested that we add the work into the existing contract with FPI by Supplemental <br />Agreement. <br />Supplemental Agreement #2 is attached to this memo, which outlines the work and costs <br />for the signal and restriping work. The City does not own any of the signal legs that are <br />being affected therefore all costs would be the responsibility of the County. The <br />Supplemental Agreement also extends the completion date of the project to allow the <br />signal modifications to be completed prior to paving the wear course bituminous on Little <br />Canada Road. We would recommend the City Council authorize approval of <br />Supplemental Agreement #2 contingent on County and MnDOT approval. <br />If you have any questions or concerns please feel free to call me at (763) 780-0450 <br />extension 3. <br />10062 Flanders Court NE — Blaine, MN 55449 — Ph: (763) 780-0450 Fax (763) 780-0452 <br />ZaPROJ\120156E - LC Road (Bridge to Edgerton) \0071\Change Orders \Memo -070214 -CC (Supptemental Agreement I/2).doo <br />1 <br />