My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-2014 Council Workshop Minutes
>
City Council Meeting Minutes
>
2010-2019
>
2014
>
09-10-2014 Council Workshop Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2014 8:58:31 AM
Creation date
9/18/2014 8:58:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />SEPTEMBER 10, 2014 <br />installed in 1998 as part of the Historical Society addition, and the <br />remaining three units (in the original part of the building) were replaced in <br />1996. It was noted that a separate air conditioning unit is also proposed <br />for the Cable TV room. hl discussing these improvements, the consensus <br />was to replace the three furnace units and AC units in the 1991 building <br />addition, as well as install an AC unit for the Cable TV room. The <br />furnaces and AC units in the basement and serving the Historical Society <br />will not be replaced at this time with the goal to get as much life from <br />them as possible given their replacement will not result in any significant <br />efficiency increases. <br />The Administrator reviewed the proposed Plumbing improvements which <br />are estimated at $9,950. The consensus was to not replace the six lavatory <br />faucets, but to proceed with other listed improvements. It was also <br />recommended that an estimate be obtained for relocation of the existing <br />drinking fountain. <br />Electrical improvements are estimated at $57,800 with the Administrator <br />noting that most of these improvements are cable related in addition to <br />replacing lighting with LED lights. Reducing the number of mechanical <br />units should lower this number. <br />The Administrator then reviewed the estimate of $3,900 for removal and <br />replacement of existing acoustical ceiling tile. The Administrator <br />indicated that in discussing this improvement with City staff, the <br />consensus was to first determine whether replacement tiles were available <br />before proceeding with complete replacement. Council agreed. <br />Next reviewed was the work item involving removal of interwall finishes <br />and replacement with ledgestone at the Council backdrop and trophy case <br />wall. Preliminary estimated cost is $18,800. With regard to the <br />conversion of the trophy case to a media center, the City Clerk requested <br />that City staff meet with the architect's designer on a media center that <br />will be functional for the City's needs. The Council agreed and the <br />Construction Manager indicated that he would set up a meeting. It was <br />noted that a 48" TV is proposed as part of the media center, and the <br />feeling was that this may be too small. This will be discussed with the <br />designer as part of the configuration of this media center. The Council <br />then reviewed the Council backdrop, and the consensus was that the City's <br />logo should be a part of that backdrop. The Council requested that the <br />Architect put together some options for the Council's review. <br />The next item discussed was for removal and replacement of carpet and <br />base at a preliminary estimate of $38,900. The Administrator noted that <br />carpet replacement would occur in all areas of the City Center, except for <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.