Laserfiche WebLink
There was a discussion on the weight limit of the road during and after <br />construction and whether or not semi -trucks with trailers could use the road <br />during construction. Mr. Elfering replied that semis would be able to use the <br />road during construction and that the final wear course would be paved in late - <br />2015 so that trucks could use the road in spring 2016. <br />Y A comment was made that Coon Rapids had reconstructed a road in front of a <br />Dock 86 and things went very well with good communication and updates. Mr. <br />Elfering stated that the City of Little Canada also provides frequent updates and <br />communicates information as much as possible. <br />Y The project timeframe was discussed. It will likely occur between May and <br />October and when the work actually takes place will depend on the contractor <br />doing the work. But once the road is reclaimed the contractor will have a set <br />number of days to complete the work. In this case that will be between 4 and 6 <br />weeks. <br />➢ There was a request for signage indicating that businesses were open during <br />construction. Mr. Elfering stated that he would implement into the construction <br />plans. <br />Those present were in favor of continuing the process of getting the road done in <br />2015. The City Administrator then said staff would recommend that the potential <br />project move forward to an improvement hearing with the Council. <br />The Country Drive property owners were thanked for their participation. <br />6 <br />