Material Testing andlnspection <br />There have been no special inspection fees or surcharges nor are any anticipated for the <br />retnainder of the project. <br />Utility Related Fees <br />The gas and electric service fee is estimated at $20,000. The gas service cost $161 and <br />we do not know what the electrical service was yet. It would seem likely that we'll be <br />under the $20,000 budget. <br />SAC charges from Met Council amounted to $14,910. The new building resulted in nine <br />SAC units and we received credit for three SAC units for the existing buildings prior to <br />demolition. So the net was six SAC units at $2485 per unit. <br />Data cabling and connection fees had an estimated budget of $10,000. The low voltage <br />work contract that was awarded to MTG last meeting was $5277 and that should cover <br />the bulk of the cabling needs. <br />Hazardous Materials Testing and Removal <br />The asbestos removal was budgeted at $10,000 and came in at $9621.14. This number <br />would have been lower but additional asbestos was discovered after the abatement <br />contractor started work. <br />The underground tank and soil contamination work was performed by American <br />Engineering and Testing. The estimate was $15,000 and the number came in at $12,900. <br />Other Items <br />The furniture and equipment costs have been budgeted in the City's regular budget <br />separately from the Facility costs. Staff has received a preliminary number of $24,000 <br />and has budgeted $25,000 for the furniture at the new facility. The equipment costs <br />include a monorail crane, concrete mezzanine storage planking, a vehicle lift for the <br />smaller trucks, a vehicle lift system for the big trucks, a lube system, washer and dryer, <br />and office equipment such as computers, copy machine, refrigerator, and microwave. <br />Not all of the equipment will be purchased in 2015. At this point staff has ballpark <br />pricing on the smaller vehicle lift - $10,000. The refrigerator will cost around $2000, the <br />lube system should be around $2500, some shelving will cost $5000, and a welding <br />bench will cost $3000. Other equipment will be prioritized once staff has had a chance to <br />move in and figure out its needs. The 2015 budget for equipment is $68,200. <br />The security system was budgeted at $25,000. As mentioned above the contract with <br />Electro -Watchmen for the card access readers and door contacts is for $11,600 and I am <br />waiting for additional numbers from Roseville IT for other security -related costs. <br />Change Orders <br />To date there have been 23 change orders. Many of them came on the front end of the <br />project before construction started. Please see the attached Change log for a full list of <br />change orders. The net result in all of the change orders is a savings for the City of <br />3 <br />