My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-2015 Council Packet
>
City Council Packets
>
2010-2019
>
2015
>
04-08-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2015 2:30:12 PM
Creation date
4/6/2015 2:25:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF ARTICLES <br />1 INITIAL INFORMATION <br />2 CONSTRUCTION MANAGER'S RESPONSIBILITIES <br />3 SCOPE OF CONSTRUCTION MANAGER'S BASIC SERVICES <br />4 ADDITIONAL SERVICES <br />5 OWNER'S RESPONSIBILITIES <br />6 COST OF THE WORK <br />7 COPYRIGHTS AND LICENSES <br />8 CLAIMS AND DISPUTES <br />9 TERMINATION OR SUSPENSION <br />10 MISCELLANEOUS PROVISIONS <br />11 COMPENSATION <br />12 SPECIAL TERMS AND CONDITIONS <br />13 SCOPE OF THE AGREEMENT <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial information set forth in this Section 1.1. <br />(Note the disposition for the following items by inserting the requested information or a statement such as 'Scot <br />applicable," "unknown at time of execution" or "to be determined later by mutual agreement.') <br />§ 1.1.1 The Owner's program for the Project: <br />(Identify documentation or state the manner in which the program will be developed) <br />(see Exhibit A) <br />§ 1.1.2 The Project's physical characteristics: <br />(Identify or describe, if appropriate, size, location, dimensions, or other pertinent information, such as geotechnical <br />reports; site, boundary and topographic surveys; traffic and utility studies; availability ofpublic and private utilities <br />and services; legal description of the site; etc) <br />TBD <br />§ 1.1.3 The Owner's budget for the Cost of the Work, as defined in Section 6.1: <br />(provide total and, if known, a line item breakdown) <br />Two Million, .Five hundred thousand (52,500,000) <br />§ 1.1.4 The Owner's anticipated design and construction schedule: <br />.1 Design phase milestone dates, if any: <br />Preliminary Design, 1/15/2014 <br />Final Design, 3/7/2014 <br />.2 Commencement ofconstruction: <br />AIA Document C132"4— 2009 (formerly 8001 r"'CI& 1£:92). Copyright ©197 1960, 1992 end 2009 by The American institute of Architects. Alt rights <br />reserved V1/RI II C This /.It. Docuncut it protected by U Cdpyriyht t rvd End Intorn tion 1 fissile tireutborined ie reduction ord ftribution of <br />thisAt/..0 Document, ora.uy portion of It, men recuts in rovere civil cod mtminci pcnaitler., anctdi to p :Cr:uteri to rho no. nmum asont pea sib Is. undo <br />ft( 1o.. This document was produced by AIA software at 10:12:33 on 12.06/2053 under Order No.1645001270 1 whioh expires an 50/57/2014, end is not for <br />resole. <br />User ldotes: <br />(1400123506) <br />
The URL can be used to link to this page
Your browser does not support the video tag.