Laserfiche WebLink
Preliminary Enelneer's Estimate <br />LITTLE CANADA, MINNESOTA <br />RAILROAD QUIET ZONE STUDY <br />LITTLE CANADA RD. EXHIBIT C-1 <br />SEH FILE LITLC 126672 <br />6/7/2016 4:11 PM C:\ projects \LlltleCanadaMN\2014 Cost Estimate 12667205062016.xls _Little Canada Ex. C-1 Tab <br />LITTLE CANADA RD. EXHIBIT C.1 <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />UNIT PRICE <br />FINAL <br />QUANTITY <br />FINAL COST <br />1 <br />MOBILIZATION <br />LS <br />$1,400,00 <br />1 <br />$1,400,00 <br />2 <br />CLEARING AND GRUBBING <br />TREE <br />9600,00 <br />1 <br />$600.00 <br />3 <br />SAWCUT BITUMINOUS FULL DEPTH <br />LF <br />$4.00 <br />376 <br />$1,600,00 <br />4 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />$400 <br />146 <br />8580.00 <br />6 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />SY <br />$6.00 <br />39 <br />$196.00 <br />8 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />SY <br />$4.00 <br />11 <br />$44.00 <br />7 <br />COMMON EXCAVATION <br />CY <br />$16,00 <br />83 <br />$1,245.00 <br />8 <br />MILL BITUMINOUS SURFACE <br />SY <br />$2.60 <br />887 <br />$1,867,60 <br />9 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />$160,00 <br />6 <br />$760,00 <br />10 <br />AGGREGATE BASE CLASS 6 (CV) <br />CY <br />$16,00 <br />56 <br />$880,00 <br />11 <br />4" CONCRETE SIDEWALK <br />SF <br />$4.25 <br />320 <br />$1,360.00 <br />12 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LF <br />$12.00 <br />240 <br />$2,880,00 <br />13 <br />CONCRETE MEDIAN (NOSE) <br />SY <br />$80,00 <br />9 <br />$720,00 <br />14 <br />TYPE SP 9.6 WEARING COURSE MIX (3,C) <br />TON <br />$80.00 <br />64 <br />$4,320,00 <br />15 <br />TYPE SP 9.6 WEARING COURSE MIXTURE (3,B) (DRIVEWAY) <br />TON <br />$110.00 <br />41 <br />$4,610.00 <br />16 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />$4.00 <br />31 <br />$124.00 <br />17 <br />BITUMINOUS PATCHING <br />TON <br />$120.00 <br />18 <br />$2,160,00 <br />18 <br />ADJUST MANHOLE <br />EACH <br />$400,00 <br />1 <br />$400,00 <br />19 <br />TRAFFIC CONTROL <br />LS <br />$1,000,00 <br />1 <br />$1,000.00 <br />20 <br />SIGNING AND STRIPING <br />LS <br />$1,000,00 <br />1 <br />91,000,00 <br />21 <br />TURF RESTORATION <br />SY <br />$6.00 <br />60 <br />$260.00 <br />SUBTOTAL <br />$27,485.50 <br />+20% CONSTRUCTION CONTINGENCIES <br />$5,500.00 <br />ESTIMATED CONSTRUCTION <br />COST <br />$32,986.50 <br />+26% LEGAL, FISCAL, ADMINISTRATION <br />& ENGINEERING <br />$8200,00 <br />TOTAL ESTIMATED COST <br />$41,185.50 <br />6/7/2016 4:11 PM C:\ projects \LlltleCanadaMN\2014 Cost Estimate 12667205062016.xls _Little Canada Ex. C-1 Tab <br />