Laserfiche WebLink
5. N.A.C. — The electrical contractor installed a conduit for a future flag pole and a <br />conduit for a receptacle in the salt storage shed. The City Council approved this <br />$1019 cost in February prior to the work commencing. N.A.C. also wired the <br />condensate pumps that were required for the infrared heaters at a cost of $525. <br />The City received a credit for $500 for core drilling at electrical conduit locations <br />as well as a $4000 credit for unused allowance on the contract. The net result is a <br />$2956 deduction in the contract. <br />The net result of all five change orders is a deduction of $4036. Staff recommends <br />approving all five change orders. <br />