My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-14-2015 Planning Comm. Agenda
>
Agenda Packets
>
2010-2019
>
2015
>
05-14-2015 Planning Comm. Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2015 1:35:02 PM
Creation date
7/2/2015 1:34:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Invert information should be obtained and added to the plan for all existing <br />sanitary sewer and storm sewer lines to verify if conflicts exist at any crossing <br />locations. <br />Preliminary Plat <br />1. We have not reviewed the preliminary plat, but our comments from the April <br />3rd memo to the Planning Commission should be addressed. <br />General Comments <br />1. No storm water calculations were provided with this proposed plan. <br />Calculations for the 2, 10, and 100 year ATLAS 14 rainfall events must be <br />submitted to ensure rate control and treatment to the required standards are <br />met before final approval. A geotechnical report for the site should also be <br />submitted including soil characteristics in the location of the infiltration <br />practice and an infiltration rate. <br />2. A Storm Water Pollution Prevention Plan (SWPPP) must be submitted for <br />approval. <br />3. There is over one acre of disturbance for the project and therefore a Ramsey <br />Washington Metro Watershed District and National Pollution Discharge <br />Elimination System (NPDES) permit will need to be obtained. Documentation <br />of the permit approvals will be required prior to any work. An approximate <br />wetland setback is shown on the plan. The Watershed is also the wetland <br />LGU and it is likely they will require a new delineation of the wetland <br />boundary to ensure accurate setback requirements are met. <br />The above items should be addressed and the plans and plat resubmitted with the <br />SWPPP and the storm water calculations so that a complete review can be completed. <br />Please contact me if you have any questions regarding the above information at (763) <br />780-0450 ext. 3. <br />3 of 3 <br />Memo -050715 -PC (Assisted Living).doc <br />10062 Flanders Court NE — Blaine, MN 55449 — Ph: (763) 780-0450 Fax (763) 780-0452 <br />You created this PDF from an application that is not licensed to print to novaPDF printer (http://www,novapdf.com) <br />
The URL can be used to link to this page
Your browser does not support the video tag.