Laserfiche WebLink
Page Two <br />Joel Hanson <br />August 27, 2007 <br />Item 8 -Permits and Approvals Required (Regan Carlson, 651-602-1407) <br />The number of jobs was not specified in the EAW. As this development goes forward it <br />will generate new jobs, likely above the Council's 2030 employment forecast for Little <br />Canada. Projected employment should be specified in the future comprehensive plan <br />amendment. <br />It is estimated that the development could generate between 1500 and 2000 jobs, based <br />on information about Phase I in the EAW, and standard employment generation ratios for <br />this type of development. The City's employment, at 6,573 for 2Q 2006, is already above <br />the Metropolitan Council's 2010 employment forecast, and is only about 700 short of its <br />2030 forecast. Before submitting its 2008 comprehensive plan update for Metropolitan <br />Council review, the City should review the City's employment forecasts with Council <br />staff and agree upon appropriate revisions to be reflected in the update. <br />Item 11-Fish, Wildlife, and Ecologically Sensitive Resources (Jim Larsen, 651-602- <br />1159) The document indicates that approximately 50 percent of the existing 23 acres of <br />forested cover on the site is proposed to be eliminated as the site is developed. Much of <br />its removal will be to accommodate new building sites and storm water detention and <br />treatment. However, Figures 3 and Sb show a significant portion of the existing <br />woodlands on steep slopes of 12 to 25 percent proposed to be removed simply to convert <br />areas to lawn/landscaping. <br />The Council encourages the project proposer to preserve more of the existing woodlands <br />on the site as it is developed. This would preserve more of the site's existing natural <br />habitat and maintain wooded cover on steep slope areas in order to reduce site runoff <br />volume and minimize the area needed for storm water basin construction. Site <br />development as proposed will significantly fragment the remaining wooded cover on the <br />site. A vegetation survey of the wooded portions of the site outside of the new building <br />footprints should be carried out by the proposer to identify opportunities for preservation <br />and restoration of higher quality wooded areas. <br />Item 18 -Water Quality: Wastewaters (Roger Janzig, 651-602-1119) <br />Metropolitan Disposal System facilities serving this site have adequate capacity for the <br />proposed project. <br />Item 21-Traffic (Ann Braden, 651-602-1705) <br />Traffic congestion from St. Jude's can be mitigated by constructing a second turn lane for <br />the westbound to southbound left turn at the Rice Street/CR B2 intersection. This will <br />require reconstruction of the traffic signal to accommodate the wider roadway approach <br />and new signal phase. <br />V:\REVIEWS\Communities\Little Canada\Letters\LitCle Canada 2007 Stlude EAW 20059-1.doc <br />