My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-2015 Council Minutes
>
City Council Meeting Minutes
>
2010-2019
>
2015
>
06-22-2015 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2015 2:38:50 PM
Creation date
7/8/2015 2:38:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />JUNE 22, 2015 <br />SENIOR <br />HOUSING - <br />HEARTH <br />DEVELOPMENT <br />memory care on the property generally southeast of the intersection of <br />Rice Street and Country Drive requested by Hearth Development. It was <br />noted that the Planning Commission recommended approval of this <br />project subject to compliance with the recommendations of the City <br />Planner and the City Engineer. <br />The City Planner reported that Hearth Development has submitted <br />additional materials since the Planning Commission meeting, and these <br />submittals appear to be consistent with Code requirements. The Planner <br />indicated that the submittals that are still missing include a signage plan <br />and an internal floor plan showing the underground parking. The Planner <br />also noted that the City Engineer will review the Final Plat to ensure that <br />the appropriate easements are being dedicated. <br />Greg Johnson, Hearth Development, reviewed the new building elevations <br />that were submitted based on the comments by the Planning Commission <br />asking for more variation in the building facade. Johnson asked the <br />Council for approval and indicated that the hope is that construction will <br />start in July or the first part of August. <br />The Planner again noted the need for a signage plan and underground <br />parking floor plan to complete the submittal package. Keis reported that <br />the City Engineer has indicated that most of his recommendations have <br />been met. Keis indicated that staff should ensure that all requirements are <br />met for this project. <br />Montour asked about the new elevations submitted. Johnson stated that a <br />turret and some additional bump -outs were added based on the Planning <br />Commission comment that they would like to see some additional <br />architectural detail in the project. <br />There was no one present from the general public wishing to comment on <br />this matter. <br />Upon motion by Fischer, seconded by Montour, the public hearing was <br />closed. <br />Montour introduced the following resolution and moved its adoption: <br />RESOLUTION NO. 2015-6-124 —APPROVING THE FINAL PLAT <br />FOR THE BLACK TERN ADDITION AND THE FINAL PLANNED <br />UNIT DEVELOPMENT (PUD) PERMIT TO ALLOW THE <br />CONSTRUCTION OFA 120 -UNIT SENIOR HOUSING FACILITY <br />CONSISTING OF INDEPENDENT LIVING, ASSISTED LIVING, <br />AND MEMORY CARE SUBJECT TO COMPLIANCE WITH THE <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.