My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-04-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
04-04-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 3:01:19 PM
Creation date
4/5/2016 4:03:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/04/2016
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wellhead Protection Plan ‐ Part 2 June 2015 <br />City of Lino Lakes, MN <br />WSB Project No. 2029‐43 Page26 <br /> <br /> <br /> <br />Objective A4: Investigate “unlocated” or undocumented wells within the City and DWSMA. <br /> <br />Action A4: Provide data to MDH, County well management, and the Minnesota Geological Survey <br />regarding the measured location of “unlocated” and undocumented wells, and investigate the “as <br />built” construction of wells without construction records. <br /> <br />Who: City of Lino Lakes Sta ff <br />Cooperators: MDH, Hugo, Centerville,CirclePines,Blaine <br />Time Frame: 5 to 7 years <br />Estimated Cost: unknown <br />How: Apply for grant funding to investigate the location of unlocated wells through <br />Objective A2, surface measurements, and inspections. <br /> <br />Objective A5: Incorporate WHP initiatives into City Plans <br /> <br />Action A5: The City will use this Wellhead Protection Plan as a resource when updating its Comprehensive <br />Plan, Local Water Management Plan, Water Supply Plan, and other relevant plans. <br /> <br />Who: City of Lino Lakes Staff orconsultants <br />Cooperators: City of Hugo, CirclePines,Centerville <br />Time Frame: When other plans are revised <br />Estimated Cost: Varies per plan <br />How: WHP initiatives willbeaddressedandincorporatedinto the City’s variousplan <br />updates. <br /> <br />Objective A6: Identify New High-Capacity Wells within the DWSMA. <br /> <br />Action A6: The City will identify new high capacity wells that are proposed for construction in or near <br />the City’s DWSMA, and/or major changes to groundwater appropriations for existing high capacity <br />wells, to determine whether the pumping of wells will alter the current boundaries of the DWSMA <br />delineations or other portions of the City’s WHP Plan. <br /> <br />Who: City of Lino Lakes Sta ff or consultant <br />Cooperators: Comprehensive WaterSupplyPlancontents <br />Time Frame: 3 to 5 years <br />Estimated Cost: varies <br />How: City will request to be notified of new permits or changes to existing <br />appropriation permits for high capacity wells near the DWSMA. If determined <br />to potentially be impactful, City Staff, Consultant, and MDH will be requested <br />to evaluate whether proposed pumping will change the boundaries of the <br />DWSMA delineated for the City’s wells or if the vulnerability of the aquifer <br />will be affected. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.