My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-04-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
04-04-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 3:01:19 PM
Creation date
4/5/2016 4:03:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/04/2016
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wellhead Protection Plan ‐ Part 2 June 2015 <br />City of Lino Lakes, MN <br />WSB Project No. 2029‐43 Page27 <br /> <br /> <br /> <br />Objective A7: Continue to monitor the water quality from City’s wells (existing and new) to ensure <br />water quality standards are met. <br /> <br />Action A7: Examine and review the annual water quality reports to ensure maximum levels of <br />contaminants are not changing. <br /> <br />Who: City of Lino Lakes Sta ff <br />Cooperators: Consultant <br />Time Frame: MDH <br />Estimated Cost: When reports are available <br />How: No additional cost – staff time <br /> <br />Objective A8: Encourage owners on ISTS and private wells to connect to city services, when they <br />become available. <br /> <br />Action A8: Re-evaluate the sewer and water connection policy when services become available in the <br />DWSMA. <br /> <br />Who: City of Lino Lakes CommunityDevelopment staff <br />Cooperators: City Council <br />Time Frame: 3 to 5 years <br />Estimated Cost: No cost <br />How: Discuss the importanceof connectionstocityservices,asthey become available. <br /> <br />B. PUBLIC EDUCATION <br /> <br />Objective B1: Develop a public support and understanding for the WHP planning through the use <br />of websites, newsletters, and handouts. <br /> <br />Action B1.1: Include information about WHP and groundwater protection in the City newsletter, <br />perhaps in conjunction with the City’s MS4 permitting requirements. <br /> <br />Who: City of Lino Lakes Sta ff <br />Cooperators: MDH, Minnesota Rural Water Association (MRWA) <br />Time Frame: Ongoing <br />Estimated Cost: $500 each mailing/posting <br />How: Identify and obtainexistingeducationalmaterialsavailable from MDH andother <br />sources. Write newsletter articles describing WHP and include contact <br />information and website addresses for existing educational resources. <br /> <br />Action B1.2: Provide information about the WHP Plan and links to other WHP related resources on the <br />City’s website. <br /> <br />Who: City of Lino Lakes Sta ff <br />Cooperators: City of Lino Lakes PublicWorksandBuildingDepartments <br />Time Frame: Ongoing <br />Estimated Cost: $500 each year of mailing/posting <br />How: Provide a summaryof WHPgoalsandimplementation.Provide links to WHP <br />related websites including MDH, Anoka County, MDA, and EPA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.