Laserfiche WebLink
Wellhead Protection Plan ‐ Part 2 June 2015 <br />City of Lino Lakes, MN <br />WSB Project No. 2029‐43 Page32 <br />  <br />  <br />  <br />Objective G2: Evaluate the water quality monitoring strategy and results to ensure that they are <br />consistent with federal and state requirements yet also take into account local conditions. <br /> <br />Action G2: Maintain water quality sampling requirements mandated by MDH and analyze trends in water <br />chemistry, looking for any possible degradation of quality or changes in aquifer hydraulics. <br />  <br />Who: City of Lino Lakes Staff <br />Cooperators: Consultant <br />Time Frame: Ongoing <br />Estimated Cost: No additional cost <br />How: Identify changes totrendsinwaterchemistrybyevaluating records of analysis <br />results. This includes sharing data with the MDH and the option to sample for <br />radiological testing. <br />  <br />Objective G3: Maintain up to date information about wells and potential contaminant sources <br />within the DWSMA. <br />  <br />Action G3: In cooperation with existing state or local agencies and programs, create and maintain a <br />database of wells, ISTS, storage tanks, and shallow disposal wells within the DWSMA. <br />  <br />Who: City of Lino Lakes Sta ff <br />Cooperators: Property owners, MDH <br />Time Frame: On going <br />Estimated Cost: $1,500 <br />How: An inventory of wells and potential contaminant sources was performed as part <br />of the development of this Plan. Database will be reviewed periodically and <br />updated as information becomes available. <br />  <br />Objective G4: If new high capacity wells are completed and begin to pump into the water supply <br />system, conduct a study to determine impact that the newly implemented high capacity wells have <br />on DWSMA boundary. <br />  <br />Action G4: In cooperation with existing state or local agencies and programs, maintain database of newly <br />implemented wells within DWSMA that was developed as a part of this WHP Plan and assess their impact <br />on the DWSMA location and vulnerability. <br /> <br />Who: City of Lino Lakes Sta ff <br />Cooperators: MDH <br />Time Frame: TBD <br />Estimated Cost: Varies <br />How: If the City receives a notice, or when the quality and quantity of water to be <br />pumped from proposed Well No. 6 is known, the City will work with MnDNR and <br />MDH to determined implications for the DWSMA or the vulnerability of the <br />aquifer. If the changes result in a required amendment to this Plan, the City will <br />seek grant funding for assistance. <br />  <br />