My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-04-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
04-04-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 3:01:19 PM
Creation date
4/5/2016 4:03:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/04/2016
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wellhead Protection Plan ‐ Part 2 June 2015 <br />City of Lino Lakes, MN <br />WSB Project No. 2029‐43 Page33 <br /> <br /> <br /> <br />H. WATER CONSERVATION <br /> <br />Objective H1: Implement a community-wide water conservation program. <br /> <br />Action H1.1: Implement conservation measures included in the Water Supply Plan as part of the 2030 <br />Comprehensive Plan. <br /> <br />Who: City of Lino Lakes Sta ff <br />Cooperators: MDH <br />Time Frame: 3 years <br />Estimated Cost: $2,500 <br />How: Educate the publictoencourageuserstovoluntarilyincorporate water saving <br />habits and tools into their lifestyles, improve the exiting water system’s <br />operation and maintenance procedure s and incorporate costs associated with <br />water conservation programs, adjusting water rate structure, and ensure that <br />all customers are paying for the water they use through audits and meter <br />replacement of calibration. <br /> <br />Action H1.2: Implement a water pricing model that encourages water conservation. <br /> <br />Who: City of Lino Lakes Sta ff <br />Cooperators: MDH <br />Time Frame: 3 years <br />Estimated Cost: $2,500 <br />How: Work with the CityCounciltostructurewaterpricingtoencourage limited <br />watering, especially during peak times. <br /> <br />I. LAND USE PLANNING AND ZONING <br /> <br />Objective I1: Eliminate or reduce the potential pollution risks to the source water aquifer and <br />minimize the risk of altering the WHPA and DWSMA. <br /> <br />Action I1.1: Include a review of this Plan as part of the normal zoning and planning review process. <br /> <br />Who: City of Lino Lakes Planning Staff <br />Cooperators: City of Lino Lakes Building Staf f <br />Time Frame: On‐going <br />Estimated Cost: Staff time <br />How: Copies of this Plan willbedistributed to Citystaff and they will review thisPlan <br />and incorporate it as part of their project planning review process. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.