My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/13/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
04/13/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 2:55:13 PM
Creation date
4/11/2016 8:53:19 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/13/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Providing connectivity to the existing commercial property south of the development is <br />an important element. Trails and sidewalks will create a pedestrian corridor and link <br />between the residential and commercial nodes. <br />Transportation Plan <br />Goals of the Transportation Plan include providing connectivity, improving traffic flow, <br />ensuring safety and street maintenance and coordinating transportation systems with <br />adjacent jurisdictions. The I-35E Alternative Urban Areawide Review (AUAR) and <br />Anoka Highway Department Access Spacing Guidelines are applicable to this <br />development. <br />Streets A, B and D are consistent with the access spacing along CSAH 54/201h Avenue as <br />proposed in the AUAR and Anoka County Access Spacing Guidelines. <br />Street A is an extension of 2 1 " Avenue (minor collector) and has 80 foot right-of-way <br />and 38 feet back to back paved roadway. Trail will extend along the north side and <br />sidewalk will extend along the south side of the roadway. <br />Street B is the main gateway to the development and will feature an arched bridge, stone <br />piers, monument signs and landscaped medians. The right-of-way starts at 110 feet and <br />tapers to 60 feet in width with 32 feet back to back paved roadway. Sidewalk is proposed <br />on both sides. <br />Street D has 60 feet of right-of-way and 32 feet back to back of paved roadway. <br />Proposed By -Pass and Turn Lanes along CSAH 54 <br />Intersection on CSAH 54 <br />& Northbound <br />Southbound <br />Street A (73rd Ave) <br />Right Turn, Through and <br />Left Turn <br />Left Turn and Through <br />Street B (Main Entrance) <br />Right Turn and Through <br />Through/Left Turn and <br />By-pass <br />Street D (Rehbein St) <br />Right Turn and Through <br />Right Turn and Through <br />Local roads within the development have 60 foot right-of-way widths and 32 foot wide <br />paved roadways. Shorter and cul de sac roads have 60 foot right-of-way and 28 foot wide <br />paved roadways. <br />A Traffic Impact Study was prepared by Spack Consulting dated February 13, 2015 and a <br />Technical Memorandum Update was prepared and dated March 27, 2015. The <br />development is expected to generate daily 7,540 trips that are distributed at the <br />intersections as follows: <br />N. <br />
The URL can be used to link to this page
Your browser does not support the video tag.