My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/11/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
05/11/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:01:01 PM
Creation date
5/6/2016 1:41:58 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/11/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />April 06, 2016 <br />Page 7 <br />b. Rule D: Erosion and Sediment Control <br />c. Rule E: Floodplain Alteration <br />d. Rule F: Wetland Alteration <br />e. Rule I: Drainage Systems <br />5. US Corps of Engineers Section 404 - Individual Permit <br />6. MDH for Water System <br />7. MCES and MPCA for Sanitary Sewer <br />RECOMMENDATIONS <br />1. Consider modifying CL grades of Street A at 21" Avenue match to reduce high/low point <br />undulation. <br />2. Add catch basin at intersection of Drive B and Street A (no valley gutters along Street A) <br />3. Add catch basins/storm sewer on Street M at station 2+70 <br />4. Add catch basin at intersection of Street E and Street N <br />5. A more detailed review of grades in townhome area to follow <br />6. Adjust HP on Street S to 2+00 to reduce catch basin spacing <br />7. Move catch basins on Street Q to 2+50 to reduce catch basin spacing <br />8. Adjust HP on Street B to 36+00 to reduce catch basin spacing <br />9. Label % grades on all drainage swales (1% min. - 2% preferred) <br />10. Add catch basin on Street A at 9+50 <br />11. Detailed grades needed for roundabout review <br />12. Add catch basins on Street E at 6+50 to reduce catch basin spacing <br />13. Add catch basin at intersection of Street E and Street N <br />14. Add catch basins on Street E at 14+00 to reduce catch basin spacing <br />15. Adjust low point on Street B to 11+75 to reduce catch basin spacing <br />16. Shift low point to 2+00 on Street K <br />17. Add catch basins to Street B at 21+30 <br />18. Check drainage at the intersection of Street P and Street B <br />19. Add catch basins to Street C at 29+50 (no doubles needed at 28+00) <br />20. Average out grades on Street C 43+50 to 56+00 (or add CB's) <br />21. Add catch basins at the intersection of Street C and Street D <br />22. Shift high point to intersection of Street D and Street V <br />23. Review drainage at the intersection of Street D and Street W (CB needed?) <br />24. Review drainage at the intersection of Street C and Street H (CB needed?) <br />25. Shift high point to intersection of Street F and Street C <br />26. Add catch basins at intersection of Street G and Street H (4+50) <br />27. Shift catch basin at the intersection of Street F (6+25) and Street G <br />28. Shift high point to intersection of Street G and Street H (19+50) <br />29. Shift high point to intersection of Street F (13+60) and Street G <br />30. Air relief valves shall be located at all high points in the system. Please provide <br />elevations for all watermains to evaluate air relief valve positioning. <br />31. There shall be a ten -foot horizontal and 18-inch vertical separation distance from all <br />sanitary and storm sewer lines. <br />32. In addition to those valves already included in the plans, valves shall be added in the <br />following locations: <br />a. Along Street M; <br />KA02029-82044dn in\Docs\20160516 Engineering Review Lino Lakes-Mattamy.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.