My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/11/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
05/11/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:01:01 PM
Creation date
5/6/2016 1:41:58 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/11/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />Building a legacy —your legacy. <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Diane Hankee PE, City Engineer <br />Date: May 4, 2016 <br />Re: Mattamy Watermark <br />Plan Review <br />WSB Project No. 2029-820 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the revised Preliminary Plat submitted on April 28, 2016 for Watermark in <br />Lino Lakes, MN prepared by Carlson McCain. The revisions were primarily to address traffic <br />and access in the north part of plat by Street D. The following are our review comments that <br />should be responded to in writing by the applicant. These are in addition to the previous <br />comments memo to Katie Larsen dated April 6, 2016: <br />GRADING, EROSION AND SEDIMENT CONTROL <br />1. The grading, erosion and sediment control preliminary plat documents need to be <br />submitted with the proposed changes for review. We do not anticipate any significant <br />changes to the proposed layouts with relation to grading, erosion and sediment control <br />preliminary. <br />2. The surface water emergency overflow for lots 127 — 116 needs to be detailed with the <br />addition of Street V access to Street C in consideration with the grades for the ghost plat. <br />The objective is to avoid additional rear yard storm sewer in the future. A profile of <br />Street V should be rough drafted to avoid replacing the roadways stubs and associated <br />yard grading. This will help ensure drainage can be addressed in the low area between <br />the two plats. <br />STORMWATER MANAGEMENT <br />l . The stormwater management design and calculations need to be updated and re- <br />submitted with the proposed changes for review. We do not anticipate any significant <br />changes to the proposed layouts with relation to the storm sewer system. <br />2. The side yard storm sewer on narrow lots needs to be coordinated with the building plans. <br />No overhanging windows or window wells can be installed. A clear 20 feet needs to be <br />provided. The applicant shall provide a summary of side yard storm sewer with pipe <br />depths and a summary of how future access for maintenance will be accommodated. <br />Equal Opportunity Employer <br />wsbeng.com <br />S:\CommwityDevelopmmt\Projeas\Plnning Cas Natermark (Mattamy Homes)\Staff Reports\20160511 PZ (PUD Dev Stage PP)\lb 20160504 Engineering Review Lino Lakes-Mattamy.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.