Laserfiche WebLink
A Site Performance Agreement shall be required to secure funds for any road repair needed due <br />to the batch plant operation. <br />Sanitary Sewer Plan <br />No sanitary sewer is required for the batch plant operation. <br />Water Supply Plan <br />A goal of the water supply plan is to provide users affordable potable water that is safe and of <br />high quality for daily consumption and fire demand. The site is served by a 16" watermain. <br />Water use for the batch plant will be approximately 24,000 gallons and the owner will install a <br />water meter to monitor usage. <br />Zoning <br />The property is currently zoned LI, Light Industrial. Per Section 1007.120 (11), Temporary <br />Batch Plants are allowed as an Interim Use Permit. <br />Current Zoning <br />LI, Light Industrial <br />Current Land Use <br />Industrial <br />Future Land Use per CP <br />Industrial <br />Surrounding Zoning and Land Use <br />Direction <br />Zoning <br />Current Land Use <br />Future Land Use <br />North <br />LI, Light Industrial <br />Industrial <br />Industrial <br />South <br />LI, Light Industrial <br />Open Space <br />Industrial <br />East <br />LI, Light Industrial <br />Agriculture <br />Industrial <br />West <br />LI, Light Industrial <br />Industrial <br />Industrial <br />Setbacks <br />The batch plant will be setback 80 feet south of Phelps Road, 150 feet west of CR 84/Otter Lake <br />Road and 160 feet north of Clearwater Creek/JD 3. <br />Alternative Urban Areawide Review (AUAR) <br />The site is within the 2005 I-35E Corridor AUAR environmental review boundary. The <br />temporary batch plant is a temporary operation consistent with the industrial Land Use Scenarios <br />#1, #2 and #3. No negative environmental impacts are anticipated. <br />