Laserfiche WebLink
4. The approved haul routes are as follows: <br />• I-35E north to CSAH 14/Main Street east to CR 84/Otter Lake Road south to Phelps <br />Road. <br />• CR 84/Otter Lake Road at Phelps Road north to CR 14/Main Street west to I-35E <br />south to MN/DOT project. <br />5. No section of CR 84/Otter Lake Road south of Phelps Road shall be used as a haul route. <br />6. A water meter shall be installed to monitor water use. <br />7. No additional stockpile materials shall be hauled and deposited on -site during the <br />temporary batch plant operations. <br />8. The remaining stockpile shall not be increased in size or height after the temporary batch <br />plant is removed. <br />ATTACHMENTS <br />1. Site Location Map <br />2. Aerial Map <br />3. City Engineer Letter dated May 4, 2016 <br />4. Applicant Narrative with Batch Plant Photo <br />5. Temporary Concrete Plant Site Plan <br />10 <br />