My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/11/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
05/11/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:01:01 PM
Creation date
5/6/2016 1:41:58 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/11/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(j) All applicable Rice Creek Watershed District requirements are <br />satisfactorily met. <br />RCWD shall provide a letter waiving any permit requirements other than having the site <br />included on MN/DOT SWPPP for SP 6281-47. <br />(k) So as to maintain compatibility with the surrounding area and to protect <br />the health, safety and general welfare of the public, the City Council may impose <br />additional limitations, conditions or requirements as it deems necessary. <br />Additional conditions will be detailed in the Council Resolution the interim use permit is <br />approved. <br />(1) The operator and property owner shall enter into a Performance <br />Agreement with the City, and financial sureties shall be posted prior to any site <br />disturbance. <br />A Performance Agreement shall be drafted by the City and entered into by the applicant prior to <br />setup and operation of the temporary batch plant. <br />RECOMMENDATION <br />Staff recommends denial of the Interim Use Permit for a Batch Plant for Arnt Construction (2209 <br />Phelps Road) due to the following outstanding issues: <br />1. Items listed in City Engineer letter dated May 4, 2016. <br />2. Grading, erosion and sediment control plans have not been submitted to the City. <br />3. A SWPPP has not been submitted to the City. <br />4. Property owner consent letter from Paul Miller has not been submitted to the City. <br />5. A letter from RCWD has not been submitted to the City. <br />6. Staff has concerns regarding the proposed internal haul routes on Phelps Road. <br />7. Existing deteriorated road conditions of Phelps Road. <br />If these outstanding issues are resolved, the interim use permit may be approved with the <br />following conditions: <br />1. The applicant shall sign a Site Performance Agreement and deposit financial sureties with <br />the City prior to set up and operation of the temporary batch plant. <br />2. The temporary batch plant shall begin set up on June 6, 2016 and shall be completely <br />removed by June 30, 2016. <br />3. Hours of operation shall be consistent with Section 901.03(4)(b): <br />7:00 a.m. to 7:00 p.m. <br />Monday through Friday <br />9:00 a.m. to 5:00 p.m. <br />Saturday <br />No construction activity allowed <br />Sunday and federal holidays <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.