My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/11/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
05/11/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:01:01 PM
Creation date
5/6/2016 1:41:58 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/11/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />Building a legacy —your legacy. <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Diane Hankee PE, City Engineer <br />Date: May 4, 2016 <br />Re: Arnt IUP Batch Plant <br />Plan Review <br />WSB Project No. 2988-200 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the Temporary Concrete Plant Site Plan prepared by EG Rud & Sons dated <br />April 25, 2016 and received by the City on April 25, 2016. The following are our review <br />comments that should be responded to in writing by the applicant: <br />GRADING, EROSION AND SEDIMENT CONTROL <br />1. The applicant needs to provide a grading, erosion and sediment control plan for review. <br />A project SWPPP shall be submitted. This is to include existing and proposed contours <br />and a site restoration plan. <br />STORMWATER MANAGEMENT <br />1. The temporary batch plant does not require a storm sewer system. <br />FLOODPLAIN <br />1. The temporary batch plant does not impact the floodplain. <br />WETLANDS <br />1. The temporary batch plant does not impact wetlands. <br />WATER SYSTEM <br />1. Non -applicable. <br />SANITARY SEWER SYSTEM <br />1. Non -applicable. <br />Equal Opportunity Employer <br />wsbeng.com <br />SACommuniry DevelopmentTrojectsTlanning CaseMnat Construction-IUP Batch Plant (2016)\Staff Repons\20160511 PZ\3 20160504 Engineering Review Lino Lakes-Aant IUP.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.