My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/08/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
06/08/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:33:59 PM
Creation date
6/7/2016 2:01:38 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/08/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />Building a legacy —your legacy. <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Diane Hankee PE, City Engineer <br />Date: June 2, 2016 <br />Re: Clearwater Creek Business Park (United Properties Distribution) <br />Plan Review <br />WSB Project No. 2988-200 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the Preliminary Plat documents dates and submitted on May 16, 2016 for <br />United Properties in Lino Lakes, MN prepared by Plowe Engineering, Inc. The following are <br />our review comments that should be responded to in writing by the applicant. <br />Reference the City's 2016 General Specifications and Standard Detail Plates for Street and <br />Utility Construction with the Final Plat and plan submittal. Include all applicable City Standard <br />Detail Plates. <br />A. SITE PLAN REVIEW <br />GRADING, EROSION AND SEDIMENT CONTROL <br />1. The applicant is to submit a Stormwater Pollution Prevention Plan. <br />2. Benchmark elevation locations need to be shown on the grading plan. <br />3. Emergency overflow elevations for the proposed pond need to be shown on the plans. <br />4. The applicant is to submit a geotechnical evaluation of the site. <br />5. FEMA floodplain limits need to be included on the grading plans. <br />6. Existing and proposed contours and spot elevations need to be more legible. <br />7. Erosion control measures are not clearly identified. Reference City Standard Detail <br />GEN-16 (silt fence), GEN-17 (rock construction entrance), GEN-18 (sediment control <br />logs), and GEN-19 (inlet protection) for all erosion control measures <br />Equal Opportunity Employer <br />wsbeng.com <br />\\mspfsv02.lps.Imal\Studios\Active Projects\CLL16007 - Clearwater Creek Business Park in Lino Lakes MN\From Others (Original Data)\20160602 Engineering Review Lino Lakes United Properties.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.