My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/08/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
06/08/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 3:33:59 PM
Creation date
6/7/2016 2:01:38 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/08/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />June 2, 2016 <br />Page 7 <br />• Although a connection was assumed in the AUAR from 201h Avenue (CSAH 54) <br />to 21"Avenue it was not using Fairview Street. If a connection is proposed from <br />21St Avenue to 20th Avenue (CSAH 54) via Fairview Street, a discussion of the <br />potential impacts and mitigation at the 20th Avenue (CSAH 54) at Fairview Street <br />intersection should be included with the traffic review. <br />2. With the increase in heavy truck traffic, WB-62 truck turning templets should be <br />provided showing that these vehicles can circulate through the site; make turns into and <br />out of the site, and make turns at key intersections (21St Avenue at Fairview Street and <br />Fairview Street at 201h Avenue). <br />3. 21St Avenue is proposed to be a temporary cul du sac ending at the south parking lot. The <br />roadway would be extended down to Cedar Street in the future. Right of way shall be <br />platted at this time based on the approved wetland sequencing. <br />4. The intersection alignment at Cedar Street needs to be adjusted and the lane configuration <br />set so that thru lanes match from the 42 foot section (north side) to the 32 foot section <br />(south side). <br />DEVELOPMENT AGREEMENT <br />1. Required with final plat. <br />PERMITS <br />1. NPDES Construction General Permit <br />2. Rice Creek Watershed Permit <br />a. Rule C: Stormwater Management Plans <br />b. Rule D: Erosion and Sediment Control Plans <br />c. Rule E: Floodplain Alteration <br />d. Rule F: Wetland Alteration <br />e. Rule G: Crossings of Natural & Artificial Conveyance Systems <br />3. US Corps of Engineers Section 404 Permit <br />4. MDH for Water System <br />5. MPCA Sanitary Sewer Extension <br />6. MCES for connection into existing MCES line along Cedar Street. <br />If you or the applicant has any questions regarding these comments, please contact Diane <br />Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us. <br />\\mspfsv02.lps.local\Studim\Aaive Projects\CLL16007 - Clearwater Creek Business Park in Lino Lakes MN\Prom Others <br />(Original Data)A20160602 Engineering Review Lino Lakes United Properties.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.