My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-25-2016 Council Packet*
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
07-25-2016 Council Packet*
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:07:39 PM
Creation date
8/15/2016 2:35:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />June 2, 2016 <br />Page 4 <br /> <br /> <br /> \\mspfsv02.lps.local\Studios\Active Projects\CLL16007 - Clearwater Creek Business Park in Lino Lakes MN\From Others <br />(Original Data)\20160602 Engineering Review Lino Lakes United Properties.docx <br />3. Extend the proposed watermain along the east and connect to the proposed watermain at <br />the north and south sides of the building to loop the system. <br /> <br />4. Include note that watermain including valves, fittings, hydrants, and appurtenances are to <br />be wrapped in polyethylene film. <br /> <br />5. Show horizontal separation on plans between sanitary sewer and watermain as 10’ min. <br /> <br />SANITARY SEWER SYSTEM <br /> <br />1. Possible conflicts include the storm sewer crossing near the connection of the sanitary <br />sewer and the building and at approximately 22+00 within the roadway. <br /> <br />2. A cleanout will need to be added between the connection of the 8-inch service and the <br />manhole to the west as the length of the service exceeds 70 feet. <br /> <br />3. Show the installation of tracer wire for sanitary service. <br /> <br />STORM SEWER SYSTEM <br /> <br />1. Provide storm sewer calculations and drainage area maps with your construction plan <br />submittal to verify the size of pipes and spacing of catch basins. <br /> <br />1. The storm pipe diameters, pipe lengths, and pipe grades need to be identified on the <br />plans. <br /> <br />2. The storm sewer is shallow throughout the project site. The applicant shall include City <br />Standard Detail Plate STR-2 and STR-10 regarding shallow pipe installation. <br /> <br />3. The applicant shall provide detail for Pond Outlet (weir) Structure. <br /> <br />B. PUBLIC ROADWAY REVIEW <br /> <br />GRADING, EROSION AND SEDIMENT CONTROL <br /> <br />Same comments as the site plan with the addition of: <br /> <br />1. The east side boulevard shall be graded to accommodate a future trail 2.5 feet behind the <br />curb. This should be included in the cross sections. <br /> <br />2. The roadway plans need to include a plan profile and cross sections every 50 feet and <br />identify boulevard grades to be minimum grade of 2% and maximum of 4:1 slopes. <br /> <br />STORMWATER MANAGEMENT <br /> <br />Same comments as the site plan with the addition of: <br />
The URL can be used to link to this page
Your browser does not support the video tag.