My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-25-2016 Council Packet*
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
07-25-2016 Council Packet*
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:07:39 PM
Creation date
8/15/2016 2:35:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />June 2, 2016 <br />Page 5 <br /> <br /> <br /> \\mspfsv02.lps.local\Studios\Active Projects\CLL16007 - Clearwater Creek Business Park in Lino Lakes MN\From Others <br />(Original Data)\20160602 Engineering Review Lino Lakes United Properties.docx <br />1. Please address how existing western ditch flows along Fairview Avenue extension will be <br />accommodated along proposed 21st Avenue. <br /> <br />FLOODPLAIN <br /> <br />Same comments as the site plan with the addition of: <br /> <br />2. The proposed crossing over Clearwater Creek will need to accommodate the future <br />sidewalk/trail extension. <br /> <br />3. The proposed crossing will require a No-Rise Certificate submitted to the City in order to <br />document no change to the floodplain elevations. <br /> <br />WETLANDS <br /> <br />Same comments as the site plan with the addition of: <br /> <br />1. 21st Avenue is proposed to be a temporary cul du sac ending at the south parking lot. The <br />roadway would be extended down to Cedar Street in the future. As part of the future road <br />extension RCWD is requiring a wetland sequencing plan for the roadway alignment all <br />the way to Cedar. The applicant is to work through the process with the RCWD. <br /> <br />ENVIRONMENTAL <br /> <br />1. No additional comments. <br /> <br />WATER SYSTEM <br /> <br />1. Water main needs to be shown in plan and profile views. <br /> <br />2. Additional gate valves required east of wet tap into existing 16-inch water main. Verify <br />gate valve location outside of curb and gutter. <br /> <br />3. Include note that all watermain including valves, fittings, hydrants, and appurtenances is <br />to be wrapped in polyethylene film. <br /> <br />4. Include note that all fittings shall be ductile iron Class 350 compact fusion-bonded epoxy <br />coated. <br /> <br />SANITARY SEWER SYSTEM <br /> <br />1. The City’s minimum sanitary sewer depth is 7.5 feet. The proposed gravity sanitary <br />sewer is 2.2 feet deep and needs to be reviewed by the applicant as soon as possible. <br /> <br />2. The forcemain shall connect into the gravity system. <br /> <br />3. Sanitary sewer needs to be shown in plan and profile views.
The URL can be used to link to this page
Your browser does not support the video tag.