Laserfiche WebLink
March 30, 2016  <br /> <br />Page | 3   <br /> <br />If traffic signals at intersections on the county highway system become warranted on  <br />the basis of projected traffic and ACHD approves and/or requires their construction,  <br />the developer/City/Township shall be responsible for all costs associated with the  <br />traffic signal design, construction and maintenance.   <br />  <br />ACHD reserves the right to exercise engineering judgment in the review of all  <br />development proposals and vary from the Matrix outlined above as applicable.  <br />  <br />  <br />Conclusion:  <br />The traffic operations analysis did show that traffic operations are acceptable with mobility on  <br />CSAH 54 being maintained.   However, given the size of the development, there are measures that  <br />will need to be addressed or implemented as stipulated in ACHD’s Development Review Process  <br />document (provided as an attachment to this comment letter).   <br />  <br />Items to be addressed include:   <br />‐ The sight distance from each of the new intersections into the site from CSAH 54 (20th  <br />Avenue N.) should be measured to determine if it is acceptable.     <br />‐ Turn lanes will need to be constructed on CSAH 54 at each of the local street tie‐in locations.    <br />  <br />Thank you again for allowing us the opportunity to review this analysis and report.  We hope to  <br />continue coordinating our efforts with the City of Lino Lakes to improve transportation as your  <br />city continues to develop.  As the Watermark development proceeds, please work with Zac  <br />Borgerding (763‐862‐4263) for the ACHD Engineering Plan Review process.   <br />  <br />Provided as an attachment is the ACHD Development Review Process document referenced in  <br />this comment letter.   <br />  <br />Sincerely,  <br />  <br />  <br />  <br />Jack Forslund, PTP  <br />Multimodal Planning Manager  <br />  <br />  <br />Attachment: ACHD Development Review Process (August, 2014)  <br />  <br />Xc:     <br />‐ File copy I:\Planning\PLANS\Plan Reviews\Lino Lakes\2016  <br />‐ Douglas W. Fischer, County Engineer (ACHD)  <br />‐ Andrew Witter, Assistant County Engineer (ACHD)  <br />‐ Jane Rose, Traffic Engineering Manager (ACHD)  <br />‐ Gina Pizzo, Engineering Design Supervisor (ACHD)  <br />‐ Jason Orcutt, Engineering Design Supervisor (ACHD)  <br />‐ Alysa Zimmerle, Environmental Planner (ACHD)  <br />‐ Zac Borgerding, Engineer 1 (ACHD)  <br />