My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/14/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
09/14/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 4:18:10 PM
Creation date
9/9/2016 2:41:44 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/14/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The applicant has indicated that they wish to construct 2 1 " Avenue to the north side of Outlot B <br />as part of this project. The applicant will be responsible for obtaining the full 80 feet of right-of- <br />way and any necessary easements. A 40-foot'/2 right-of-way will be required to be platted with <br />this project and the applicant must obtain a 40-foot easement for streets, drainage and utilities on <br />the Centerville side of the street. The street easement benefitting Centerville must be in place <br />prior to filing the final plat. <br />The site plan shows two new accesses for Lot 1. The southern access straddles the lot line <br />between Lot 1 and Outlot B. An access easement agreement has been provided for this shared <br />access. The easement agreement must be approved by the City Attorney and recorded. <br />Floodplain <br />A portion of the site (primarily adjacent to JD3) is in the FEMA floodplain. Section 1103 of the <br />City Code provides standards for development in the floodplain. The applicant must obtain a <br />letter of Letter of Map Revision. This is a condition in the City Engineer's memo. <br />Wetlands <br />There are number of wetlands delineated on site and in the area where the 21 st Avenue <br />improvements are planned. A Wetland Replacement Plan and supplemental information has been <br />submitted to RCWD and the USACE for review. Approval will be required prior to construction. <br />As noted, in the City Engineer's memo, the applicant is required to provide a copy of the wetland <br />sequencing and mitigation plan to the City. <br />Zoning <br />Lot 1 is zoned PUD-Planned Unit Development and will comply with the underlying LI zoning <br />standards. The PUD approved outside storage of trailers in the areas shown on the plans. <br />Architecture <br />Section 1007.043 provides architectural standards for commercial and industrial buildings. The <br />plans comply with the ordinance standards. <br />The plans show a "suggested guardhouse location" near the southwest entrance to the loading <br />area. No details for the guard house are provided and the applicant has indicated that it is an <br />option and they have not yet confirmed the need. If a guard house is requested, the applicant <br />must be show materials that have a "harmonious finish treatment" with the principal building. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.