My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/14/2016 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2016
>
09/14/2016 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 4:18:10 PM
Creation date
9/9/2016 2:41:44 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/14/2016
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />September 7, 2016 <br />Page 3 <br />TRANSPORTATION <br />1. The roadway design plans are being reviewed by the City of Centerville and a Joint <br />Powers Agreement is being completed. <br />2. A Roadway, Drainage and Utility Easement shall be dedicated for the roadway which is <br />on the boarder of the Cities of Lino Lakes and Centerville. <br />3. The roadway grading may not start until the ACOE Section 404 Permit is obtained. <br />4. Substandard soils, peat, shall be excavated from within the roadbed and a note shall be <br />add the roadway typical section. <br />5. The roadway shall be designed to 40 mph for curvature. <br />6. The roadway shall meet a 10 ton design. <br />7. Typical sections only need to be cut every 50 feet and at driveways/intersections. <br />Approximately 20 typical sections per plan sheet. The sections shall include: <br />• Side slope (4:1) <br />• West side shall match existing <br />8. A signing and striping plan shall be added to the plans. This shall include a center turn <br />lane with developed (via striping) turning lanes to the distribution center. <br />9. Add to Curb & Bituminous Note #2 that all saw cuts are `full -depth'. <br />DEVELOPMENT AGREEMENT <br />1. Provided with the final plat. <br />• The contractor shall submit a 2 year maintenance bond and insurance. <br />PERMITS <br />The applicant shall provide the following permits prior to final plat approval. <br />10. ACOE Section 404 Permit <br />11. MPCA Section 401 Certification <br />12. State Historic Preservation Office Cultural Resources Review <br />13. MDH Watermain Extension Permit <br />14. MPCA Sanitary Sewer Extension Permit <br />15. MDNR No Rise Certificate <br />If you or the applicant has any questions regarding these comments, please contact Diane <br />Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us. <br />\\mspfsv02.lps.local\Studios\Active Projects\CLL16009 - Clearwater Creek final PUD and final plat\From Others (Original <br />Data)\2016-09-07 Engineering Review #3 United Properties.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.