Laserfiche WebLink
4 Stantec <br />August 31, 2016 <br />File: 193803433 <br />Attention: Mike Ericson <br />Administrator <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br />Dear Mike, <br />Stantec Consulting Services Inc. <br />2335 Highway 36 West <br />St. Paul MN 55113 <br />Tel: (651) 636-4600 <br />Fax: (651) 636-131 1 <br />Reference: 21 st Avenue, South of Commerce Drive <br />We have reviewed the plans for the proposed improvements to 21 st Avenue, south of Commerce <br />drive and offer the following comments. After your review, please pass them on to the City of Lino <br />Lakes, so they may have the developer incorporate the necessary changes. <br />Storm Sewer <br />• We concur with the requirements of the City of Lino Lakes' Engineering staff to design the <br />storm sewer (pipes and inlets) to a 10-year storm event. We would add that any low points <br />should be designed for the 100-year event. <br />The standard detail plate for Rip Rap at RCP Outlets (STR-7) says that: "Requirements for rip <br />rap size, thickness will be designated in plans." We do not see a note detailing this. Also, <br />the detail notes the length of the rip rap area past the end of the apron "as directed by <br />the engineer." Again, this should be called out on a plan sheet. Finally, it is not clear how <br />details STR-7 and STR-9 work together. For instance, the rip rap detail has fabric tucked <br />under the apron, but this will be complicated by the sheet piling. <br />SWPPP <br />• The owner should be listed as United Properties as we understand the project. <br />• The description of the project area should be amended to include grading, BMP <br />installation and other activities which takes place in Centerville, as shown on the plans. <br />• We are concerned that the project SWPPP does not contemplate the placement of <br />material on the Rhebein property, west of 21 st Avenue. We would like to see the project <br />SWPPP revised to include the fill site. Despite this site being a separate parcel, it is clearly a <br />connected activity and part of the project. <br />Road Design <br />• An entrance, with curb cut and concrete apron, for the Rhebein black dirt business should <br />be provided, south of the creek crossing. Once this entrance is in place, all traffic into and <br />out of the area should utilize it. It may be appropriate for this entrance to be opposite the <br />northernmost driveway entrance to the distribution center site. <br />• A striping and signage plan should be developed for the project. We will review this once <br />submitted. <br />• The vertical curves at 1+25, 4+50 and 6+50 have low algebraic differences and represent <br />either high or low points. This makes for very flat grades near the high and low points, <br />respectively. We suggest either making shorter vertical curves (some algebraic differences <br />Design with community in mind <br />sm v:\1938\active\193803433\design\ericson_mrSA21st ave. plan comments 8.30.16.docx <br />