My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-26-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
09-26-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:19:55 AM
Creation date
9/28/2016 4:08:19 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/26/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie LarsenSeptember 7, 2016Page 3 <br />\\mspfsv02.lps.local\Studios\Active Projects\CLL16009 - Clearwater Creek final PUD and final plat\From Others (Original Data)\2016-09-07 Engineering Review #3 United Properties.docx <br />TRANSPORTATION <br />1. The roadway design plans are being reviewed by the City of Centerville and a JointPowers Agreement is being completed. <br />2. A Roadway, Drainage and Utility Easement shall be dedicated for the roadway which ison the boarder of the Cities of Lino Lakes and Centerville. <br />3. The roadway grading may not start until the ACOE Section 404 Permit is obtained. <br />4. Substandard soils, peat, shall be excavated from within the roadbed and a note shall beadd the roadway typical section. <br />5. The roadway shall be designed to 40 mph for curvature. <br />6. The roadway shall meet a 10 ton design. <br />7. Typical sections only need to be cut every 50 feet and at driveways/intersections.Approximately 20 typical sections per plan sheet. The sections shall include: <br />Side slope (4:1) West side shall match existing <br />8. A signing and striping plan shall be added to the plans. This shall include a center turnlane with developed (via striping) turning lanes to the distribution center. <br />9. Add to Curb & Bituminous Note #2 that all saw cuts are ‘full-depth’. <br />DEVELOPMENT AGREEMENT <br />1. Provided with the final plat.The contractor shall submit a 2 year maintenance bond and insurance. <br />PERMITS <br />The applicant shall provide the following permits prior to final plat approval. <br />10. ACOE Section 404 Permit11. MPCA Section 401 Certification12. State Historic Preservation Office Cultural Resources Review13. MDH Watermain Extension Permit14. MPCA Sanitary Sewer Extension Permit15. MDNR No Rise Certificate <br />If you or the applicant has any questions regarding these comments, please contact Diane Hankee at (651) 982-2430 or diane.hankee@ci.lino-lakes.mn.us.
The URL can be used to link to this page
Your browser does not support the video tag.