Laserfiche WebLink
Ms. Katie LarsenSeptember 7, 2016Page 2 <br />\\mspfsv02.lps.local\Studios\Active Projects\CLL16009 - Clearwater Creek final PUD and final plat\From Others (Original Data)\2016-09-07 Engineering Review #3 United Properties.docx <br />ENVIRONMENTAL <br />1. A Phase I Archeological Survey has been completed for the project and no archaeological sites were found within the project area. <br />2. The developer is providing the buffer to Clearwater Creek as outlined in the Conservation Design Framework of the AUAR. <br />WATER SYSTEM <br />1. The watermain extension along the north side of the building shall be 8 inch diameter watermain. <br />2. The Fire Department Connection shall be 5 inch Storz fitting. <br />3. The hydrants shall be WB-67 per City specification with the exception to use 5 inch Storz fittings. The City is in the process of changing their standard specification to this. <br />4. Hydrant spacing shall be 300 foot maximum, please review and revise if necessary. <br />5. Revise/eliminate Watermain Note #6 stating hydrants are placed 5 feet off the back of curb. <br />6. Show gate valves on hydrant leads. Call out a wet tap on the construction plans for hydrants along the 16 inch trunk watermain. <br />SANITARY SEWER SYSTEM <br />1. Change the material type for the pipe segments from the Existing Sanitary Manhole to SAN MH-1, SAN MH-1 to SAN MH-2, and SAN MH-2 to SAN MH-3 to SDR 26 due to their depth. (Sheets 3.4, 3.6) <br />2. Include Standard Detail Plate San-7 (sanitary sewer service) in the plan set. <br />3. Provide a stub to the south of SAN-5 for future extensions/connections. <br />STORM SEWER SYSTEM <br />1. Provide revised storm sewer calculations and area maps using the required 10-year storm event to verify the sizes of pipes and spacing of catch basins (currently provided for 3-year storm event). <br />2. The storm pipes between CBMH C-11, CBMH C-10, and FES are not accurately shown in the profile on the plan. (Sheet C3.3) <br />3. Provide a Storm Note that ‘The FES and last 3 pipe joints and are to be tied’.