My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-26-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
09-26-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:19:55 AM
Creation date
9/28/2016 4:08:19 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/26/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie LarsenSeptember 7, 2016Page 2 <br />\\mspfsv02.lps.local\Studios\Active Projects\CLL16009 - Clearwater Creek final PUD and final plat\From Others (Original Data)\2016-09-07 Engineering Review #3 United Properties.docx <br />ENVIRONMENTAL <br />1. A Phase I Archeological Survey has been completed for the project and no archaeological sites were found within the project area. <br />2. The developer is providing the buffer to Clearwater Creek as outlined in the Conservation Design Framework of the AUAR. <br />WATER SYSTEM <br />1. The watermain extension along the north side of the building shall be 8 inch diameter watermain. <br />2. The Fire Department Connection shall be 5 inch Storz fitting. <br />3. The hydrants shall be WB-67 per City specification with the exception to use 5 inch Storz fittings. The City is in the process of changing their standard specification to this. <br />4. Hydrant spacing shall be 300 foot maximum, please review and revise if necessary. <br />5. Revise/eliminate Watermain Note #6 stating hydrants are placed 5 feet off the back of curb. <br />6. Show gate valves on hydrant leads. Call out a wet tap on the construction plans for hydrants along the 16 inch trunk watermain. <br />SANITARY SEWER SYSTEM <br />1. Change the material type for the pipe segments from the Existing Sanitary Manhole to SAN MH-1, SAN MH-1 to SAN MH-2, and SAN MH-2 to SAN MH-3 to SDR 26 due to their depth. (Sheets 3.4, 3.6) <br />2. Include Standard Detail Plate San-7 (sanitary sewer service) in the plan set. <br />3. Provide a stub to the south of SAN-5 for future extensions/connections. <br />STORM SEWER SYSTEM <br />1. Provide revised storm sewer calculations and area maps using the required 10-year storm event to verify the sizes of pipes and spacing of catch basins (currently provided for 3-year storm event). <br />2. The storm pipes between CBMH C-11, CBMH C-10, and FES are not accurately shown in the profile on the plan. (Sheet C3.3) <br />3. Provide a Storm Note that ‘The FES and last 3 pipe joints and are to be tied’.
The URL can be used to link to this page
Your browser does not support the video tag.