My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-26-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
09-26-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:19:55 AM
Creation date
9/28/2016 4:08:19 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/26/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eagle Brook Church Lino Lakes Campus – Online Addition Narrative.dotx <br /> <br /> <br /> <br /> <br />September 1, 2016 <br /> <br />Re: Eagle Brook Church Lino Lakes Addition, Online <br /> 7775 20th Avenue North <br /> Lino Lakes, MN 55038 <br /> <br />Parcel ID: 11-31-22-41-0004 <br />Legal Description: Lot 1, Block 1, Eagle Brook Addition. <br /> <br />Online Addition Narrative: <br /> <br />PURPOSE: <br />This proposal is for a 5,612 sf addition to the existing church campus at Lino Lakes. The addition will <br />relocate the existing audio and video control room for the Lino Lakes Campus and the Master Control <br />Room that feeds Eagle Brook’s satellite campuses along with the engineering room that houses all the <br />racks of equipment for their technology. It also adds one control room for a new online – web service that <br />Eagle Brook intends to launch in 2017 and two other potential/future control rooms that would support <br />future campuses. There is also a conference room/viewing room that allows executive team members to <br />see what all the campuses are seeing, a small office area for approximately 5-8 technical staff, an audio <br />studio that provides a controlled video recording room and support spaces such as toilets, mechanical <br />and electrical rooms. <br /> <br />No seats are being added to the worship space and in fact, the online service provides an opportunity <br />that might help decrease onsite attendance. Most of the staff and volunteers in this space are being <br />relocated from existing spaces that will be converted to storage and support spaces for the worship <br />center. A couple new staff and a dozen volunteers will be added to operate some of the new services the <br />addition provides. <br /> <br />The addition improves the technical operations at Eagle Brook Church to meet the current and future <br />demands for the technology they utilize. It also provides upgraded security, power requirements and <br />mechanical equipment to keep them operating smoothly. <br /> <br />EXISTING CONDITIONS PROPOSED CONDITIONS <br />Property = 91.2 acres (3,973,150 sf) = no change <br />Impervious Cover = 15.77 acres (687,005 sf) =15.92 acres (693,475) <br />Impervious % = 17.3% = 17.5% <br />Parking Provided = 1,075 spaces = no change <br />Worship Seats = 2,100 = no change <br />Parking Required = 700 spaces (1:3 Seats in Worship) = no change <br /> <br />Existing Building SF (Ground) = 57,618 sf = 63,230 sf <br /> (Upper) = 27,524 sf = no change <br /> (Total) = 85,142 sf = 90,754 sf <br />Type of Construction = 1-B = 1-B <br />Allowable Area = Unlimited = no change <br />Fire Protection = Sprinkled Throughout = Sprinkled Throughout <br />
The URL can be used to link to this page
Your browser does not support the video tag.