My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-26-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
09-26-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:19:55 AM
Creation date
9/28/2016 4:08:19 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/26/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Online Addition Narrative <br />Eagle Brook Church Lino Lakes Campus – Online Addition <br />7-18-2016 <br />Page 2 of 2 <br />\\05cfs01\prod\1519400\03-Data\Code-Regulatory\Site Plan Submittal\REV1 Eagle Brook Lino Lakes Addition - Online Narrative.docx <br />Rev. Apr. 2015 <br /> <br /> <br />The location of the addition is on the Northwest side of the existing church and will not be seen from 20th <br />Avenue or any adjacent properties to the south. It is approximately 260 feet from the north property line <br />and currently there are no structures that would have visibility of the addition. The footprint of the <br />addition is completely inside the existing fire road that surrounds the west side of the church; so there is <br />no change to access or conditions for fire protection. <br /> <br />The exterior of the addition will have materials to match the existing building: Architectural Precast <br />concrete (red and buff), Architectural Metal Panel and a Storefront Glazing System. The height of the <br />building matches the low roof of the existing church that it butts into. Some landscaping is provided to <br />soften the north and south elevations. Wall mounted exterior light fixtures to match the existing building <br />lighting for both aesthetics and performance will be provided at the two building exits. <br /> <br />End.
The URL can be used to link to this page
Your browser does not support the video tag.